Skip to content

Add figure manifest to HANDOFF.md (Phase 6 of EPIC #290) - #317

Merged
jaredgalloway merged 1 commit into
mainfrom
296-figure-manifest
Aug 18, 2026
Merged

Add figure manifest to HANDOFF.md (Phase 6 of EPIC #290)#317
jaredgalloway merged 1 commit into
mainfrom
296-figure-manifest

Conversation

@jaredgalloway

Copy link
Copy Markdown
Member

Closes #296

Adds a "Figure manifest" subsection to HANDOFF.md §5 mapping all 22
manuscript-included figures (via \includegraphics at f79ac4a) to
pipeline status: 10 regenerated (spike pipeline,
results-prod-294-naive-baseline-arm/), 12 missing — each with an
owner (#293, the new simulation-figures stub #316, or "out of
scope"). Also corrects a stale "S11–S15" reference to "S13–S15" at the
line documenting Phase 3's descope (S11/S12 are in fact regenerated).

Raised stub #316 for the simulation-figure gap (Figure 2, S1–S5) —
mostly renames of existing notebook outputs, not new analysis; full
breakdown in #296 and in the stub body.

Deviations from spec

None. Implementation matches issue #296 exactly: one HANDOFF.md
subsection, one stale-sentence fix, one stub raised. No pipeline,
Snakefile, notebook, or docs-page files touched; the derivation script
used to re-verify the manifest lives in _ignore/296-figure-audit/ and
is not committed.

Yolo trail: spec gate ✓, plan gate ✓ — full log in _ignore/yolo/296.log

@jaredgalloway
jaredgalloway merged commit 8d7591c into main Aug 18, 2026
4 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Phase 6 of EPIC #290: Figure manifest for the handoff

1 participant