Skip to content

Record #295 closure in HANDOFF.md - #314

Merged
jaredgalloway merged 1 commit into
mainfrom
295-close-handoff-sync
Aug 18, 2026
Merged

Record #295 closure in HANDOFF.md#314
jaredgalloway merged 1 commit into
mainfrom
295-close-handoff-sync

Conversation

@jaredgalloway

Copy link
Copy Markdown
Member

Docs-only sync following the close of Phase 5 (#295) as delivered-by-Phase-2.

HANDOFF.md carried two stale references flagging #295 as awaiting a
close/repurpose call. The DAG owner has now made that call — close it — so both
are updated:

  • Phase table (line 298): ⚠️ emptied by Phase 2 — needs an explicit close/repurpose call✅ closed as delivered-by-Phase-2 (figures shipped in PR #309).
  • Open-questions note (line 373): rewritten rather than deleted. The original
    warned that Phase 5 of EPIC #290: Shift-by-site heatmap and titer validation figures #295's body is the only record of the Figure 4 zoom regions and
    the Figure 5 x-axis warning, so the note now points at the (closed) body and
    its audit comment instead of dropping those facts. It also records that the
    manuscript's ">1,000-fold" A419S claim refers to measured titers, not the
    model's predicted enrichment ratio (predicted: Delta 0.854 / BA.1 0.132 /
    BA.2 0.137) — a distinction that is easy to misread as a failed replication.

The log-x requirement for Figure 5 was explicitly dropped, not deferred; no
follow-up issue was filed. Over xlim=[0.1, 1.3] — barely one decade — linear is
the better rendering.

No code, config, or pipeline files are touched, so nothing invalidates the fit
cache.

Deviations from spec

The spec (#295) called for building Figures 4 and 5. No figure work was
performed
— an audit confirmed Phase 2 (PR #309) had already shipped both,
verified constant-by-constant, so the issue was closed as already-satisfied
rather than implemented. This PR carries only the resulting documentation sync.
Three spec items that Phase 2 resolved differently (the predicted_func_score
blocker routed around via collection_muts.csv, the titer CSVs fetched at a
pinned commit rather than vendored, and the unnecessary '142L' -> 'D142L'
fixup) are recorded in the #295 audit comment and required no action here.

Yolo trail: work-issue stub gate STOPped to the user (scope call, not a workflow gate) — full log in _ignore/yolo/295.log

Phase 5 (#295) is closed as delivered-by-Phase-2: both its figures
(shift_by_site_heatmap_zoom, validation_titer_fold_change) shipped in
PR #309 and were verified constant-by-constant against its spec.

Updates the two stale references that flagged #295 as awaiting a
close/repurpose call. The second note is rewritten rather than dropped
so the Figure 4 zoom regions and the Figure 5 x-axis warning stay
discoverable, and records that the manuscript's ">1,000-fold" A419S
claim refers to measured titers rather than the model's predicted
enrichment ratio.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
@jaredgalloway
jaredgalloway merged commit d96ef1e into main Aug 18, 2026
4 checks passed
@jaredgalloway
jaredgalloway deleted the 295-close-handoff-sync branch August 18, 2026 01:54
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant