Release and deploy the 429 fix before the 21 November cron — GATED, do not start without explicit instruction #517

Open

Description

@Polichinel

Epic: #512 · Story 6 of 6 · depends on #511, #513, #514, #515 · last

⛔ Gate: do not start this issue without explicit instruction

This is the only story in the epic that is not picked up autonomously when its
dependencies close. Standing rules: never branch from or PR to main unless told; always
confirm before a version bump, a merge to main, a tag, or a deploy. The issue exists so the
work is visible and ordered, not so it can be started.

Why this matters

Everything else in this epic is inert until it is deployed.

  • The server runs tag v1.15.0 (.views-deploy-tag, installed wheel
    views_datafactory-1.15.0.dist-info), which contains the 429 defect.
  • The next monthly cron is 0 0 21 * * → 21 November 2026.
  • The 21 October run aborted on that defect. A fix sitting on development would not have
    saved it, and will not save the next one.

That is the entire argument for this story: a merged fix is not a deployed fix, and the
gap between the two has its own register entry.

The work

Follow docs/guides/server_quickref.md as the authority. It is authoritative because it was
made so deliberately, after the alternative failed repeatedly.

C-343 — "writing the deploy tag is not deploying" — has recurred five times in eight days.
reports/post_mortems/2026-10-20_release_v1150.md is the fifth round, and each round was a
correction to the previous round's blind spot: #497 found four more copies of a one-step claim;
#498 found that ~ after sudo expands as the caller, so six verification commands read the
wrong home; #499 gave the procedure one home and added the tmux rule; #500 found that the
authority established in #499 carried a duration figure nobody had ever measured.

The through-line, recorded at reports/technical_risk_register.md: a consolidation
concentrates error as effectively as it concentrates authority.
The practical consequence for
this story: follow the written procedure, do not reconstruct it from memory, and do not
improve it in passing.

Two specifics that bit before and are easy to repeat:

  • sudo -u views-deploy commands must source ~/.profile, and ~ after sudo expands as the
    caller — use absolute paths.
  • The run takes ~7 hours and SSH will drop. Use tmux
    (docs/guides/hetzner_deployment_guide.md:30).

Acceptance criteria

  • Version bumped; development → main via PR; tagged. Each step confirmed first.
  • Deployed, and the deployment verified by observation, not assertion:
    .views-deploy-tag and the installed wheel version agree with the new tag.
  • A harvest observed running on the new code — this is the step C-343 keeps catching.
    Writing the tag is not deploying; installing the wheel is not running it.
  • The 429 path confirmed present in the deployed artifact (e.g. the new constant is
    importable from the installed package on the server, not just present in git).
  • A post-mortem added under reports/post_mortems/ per the existing convention
    (YYYY-MM-DD_release_vNNN.md, with the fixed header block and the
    "## The thing to read if you read nothing else" section).
  • CI green on main after the merge — not dismissed as pre-existing. We are the sole
    developers of this repo; a red check is ours.

Validation

Per docs/guides/server_quickref.md. The verification block there is itself newly trustworthy:
reports/post_mortems/2026-10-20_release_v1150.md:195-198 records that on 2026-10-16 its first
command died on the ~-expansion defect, so the block added on 2026-10-13 had never once
executed successfully
until the v1.15.0 release. Run it and read its output; do not assume it
passed because it printed.

Out of scope

  • Any code change. If a defect surfaces during the release, it gets its own issue; the release
    does not grow to absorb it.
  • Improving the deployment procedure. If it is wrong again, that is a sixth C-343 round and its
    own issue — not collateral work inside a release.
  • Changing the cron schedule or the monitoring grace window.

Activity

  1. added
    storySingle implementable unit within an epic
    deployRelease and deployment readiness
    and removed
    deployRelease and deployment readiness
    on Oct 21, 2026
  2. Polichinel commented on Oct 21, 2026

    @Polichinel
    ContributorAuthor

    Removed the deploy label.

    In this repo that label is a release gate, not a category tag: tests/test_falsification_deploy_v140.py::TestSF2DeployTrackingIssuesClosed::test_deploy_epic_issues_closed asserts that zero open issues carry it, so an open deploy issue blocks a release by design.

    Applying it to the release story itself is self-referential — the release would block the release — and it turned the suite red the moment the label was added. A check that cannot go green until the issue closes is indistinguishable from a broken build, which is C-320's recorded lesson.

    Labels are now story + needs-decision. The gate on this issue is the ⛔ note in the body and the standing rule behind it, not a label.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    needs-decisionstorySingle implementable unit within an epic

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions