Skip to content

Timer flushes wait during any prewarm, so the start after a cold start does not compact (Ocarina of Time 762 s → 3.3 s) - #1879

Closed
bettterlabs wants to merge 3 commits into
seedds:mainfrom
bettterlabs:pr1-prewarm-flush
Closed

bettterlabs wants to merge 3 commits into
seedds:mainfrom
bettterlabs:pr1-prewarm-flush

Merge remote-tracking branch 'origin/main' into pr1-prewarm-flush

beccca4
Select commit
Loading
Failed to load commit list.
Sign in for the full log view