Skip to content

About

AI-powered engineering document quality assurance agent with iterative review and Run 1 vs Run 2 comparison.

Topics

Resources

Stars

0 stars

Watchers

0 watching

Forks

Repository files navigation

Engineering Document Quality Assurance — ChatGPT-Assisted Case Study

Project Overview

This project demonstrates a structured, ChatGPT-assisted approach to reviewing engineering maintenance documentation. The review uses a fictional six-step centrifugal pump maintenance procedure for equipment P-101.

The objective is to identify documentation gaps, ambiguous instructions, missing acceptance criteria, safety-related omissions, and items requiring further verification.

Project type: AI-assisted engineering document QA case study
Domain: Mechanical Engineering, Industrial Maintenance, Technical Documentation
Tools: ChatGPT, GitHub, structured review prompts, PDF reports

Objectives

  • Identify missing information and ambiguous maintenance instructions.
  • Trace findings to the relevant source-procedure steps.
  • Recommend corrective actions and appropriate verification sources.
  • Distinguish documentation gaps from confirmed real-world hazards.
  • Compare a baseline review with a review using more explicit instructions.
  • Document limitations and the need for qualified human verification.

Methodology

Run 1 — Fresh Baseline Review

A fresh review was prepared using the fictional maintenance procedure and a structured prompt. The report identifies documentation gaps and provides a findings register, checklist, unanswered questions, and safety limitations.

Run 2 — Improved Review Instructions

A second review used more explicit instructions for finding traceability, priority rationale, confidence ratings, non-duplication, and verification planning.

Comparison

The two available reports were compared to examine differences in finding coverage, structure, uncertainty handling, and verification planning. The comparison records observed differences rather than assuming that a higher finding count automatically means better quality.

Execution transparency: The reports were prepared in separate ChatGPT conversations with human-directed prompts. This repository documents a ChatGPT-assisted iterative review workflow. It does not demonstrate an independently deployed or autonomous AI agent, and no separate agent-platform trajectory has been captured.

Key Results

  • Run 1: 9 preliminary documentation findings.
  • Run 2: 13 preliminary documentation findings.
  • Run 2 adds more explicit priority rationales and confidence ratings.
  • Run 2 provides a more structured verification plan and checklist.
  • The comparison highlights the importance of traceability, uncertainty handling, and human review.

Finding counts are descriptive, not a standalone measure of quality. The findings require technical review to assess accuracy, overlap, and practical relevance.

Repository Contents

File Description
Run_1_Engineering_Document_QA_Report.pdf Fresh baseline review report
Run_2_Engineering_Maintenance_Procedure_Quality_Review.pdf Review using improved instructions
Run_1_vs_Run_2_Engineering_Document_QA_Comparison.pdf Updated comparison of the two review outputs
Run_1_vs_Run_2_Comparison_and_Final_Capstone_Report.pdf Earlier comparison and capstone report

Review Criteria

The reviews consider:

  • Energy isolation and verification requirements
  • Safe access and risk-assessment references
  • PPE requirements and applicable procedures
  • Inspection methods and acceptance criteria
  • Component damage and replacement criteria
  • Reassembly, pre-start checks, and restart authorization
  • Post-start monitoring and maintenance records
  • Document control, unresolved questions, and verification needs

Limitations and Safety

  • The maintenance procedure is fictional and intended for training.
  • The findings have not been independently validated against an OEM manual, site procedure, engineering drawing, or formal risk assessment.
  • Priorities are preliminary reviewer judgments, not formal risk ratings.
  • A gap in the supplied excerpt does not prove that a control is absent from the wider site maintenance system.
  • The reports must not be used as operational maintenance instructions or as evidence of procedure approval.
  • Qualified personnel must verify engineering and safety requirements before real-world use.

Skills Demonstrated

  • Engineering documentation review
  • Technical writing and quality assurance
  • Prompt design and instruction refinement
  • Evidence traceability and structured reporting
  • Comparative output evaluation
  • Identification of uncertainty and verification requirements
  • Safety-aware human oversight

Project Links


Summary: This case study illustrates how structured prompts and human review can support engineering document quality assurance. It emphasizes traceable findings, careful handling of uncertainty, and transparent reporting of limitations.

About

AI-powered engineering document quality assurance agent with iterative review and Run 1 vs Run 2 comparison.

Topics

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors