Skip to content

[PR] chore: empty PR — full CI gate on current master (pre-release check) - #4968

Closed
ranxianglei wants to merge 1 commit into
masterfrom
2026-10-27_empty-pr
Closed

ranxianglei wants to merge 1 commit into
masterfrom
2026-10-27_empty-pr

Conversation

@ranxianglei

Copy link
Copy Markdown
Owner

空 PR,无任何代码改动(仅一个空提交)。

目的:下一次发版前确认当前 master 头(e4cc6857)能一把过 full CI。跑完看结果即可关闭本 PR。

@github-actions

github-actions Bot commented Oct 27, 2026 •

Copy link
Copy Markdown
Contributor

📦 Built Package Artifact

Branch: 2026-10-27_empty-pr (1466f02)

Latest build — install this exact version

npm install -g billion-context@0.0.7391-pr.4968.5ad7bda

This exact version is immutable and reproducible. The rolling pr tag tracks the newest test build across all PRs.

Recent builds (commit → version)

commit version build
1466f02 billion-context@0.0.7391-pr.4968.5ad7bda build
c80b11f billion-context@0.0.7350-pr.4968.9a05435 build
0f58fa0 billion-context@0.0.7029-pr.4968.9a1e460 build
0e10e42 billion-context@0.0.6873-pr.4968.770588e build
0552dc3 billion-context@0.0.6515-pr.4968.6ac0956 build
b5970bf billion-context@0.0.6490-pr.4968.edaa169 build
cdfd4f3 billion-context@0.0.6482-pr.4968.6bf3170 build
f292be3 billion-context@0.0.6479-pr.4968.1abd4ae build

Download artifact

  1. Download the artifact from the Actions run
  2. Extract the tarball and install:
tar xzf billion-context-pr4968.tgz
npm install -g package

Install instructions are refreshed on each push.

@ranxianglei ranxianglei changed the title chore: empty PR — full CI gate on current master (pre-release check) [PR] chore: empty PR — full CI gate on current master (pre-release check) Oct 27, 2026
@ranxianglei

Copy link
Copy Markdown
Owner Author

🤖 Powered by ework · qwen3.8-27b

(ai: vllm/qwen3.8-27b) Merge-guard sync done: rebased the empty commit onto current master tip (c499b145) and force-pushed head → cdfd4f320. PR is no longer behind — mergeable=true, mergeable_state=blocked only because the full CI gate is now queued/running on the new head (10 check runs launched); that blocked state is the intended pre-release-check behavior, not a conflict. No design decisions needed.

@ranxianglei ranxianglei added the ci:full Run the FULL CI matrix (all e2e lanes + 12-leg test matrix) on this PR label Oct 27, 2026
@ranxianglei

Copy link
Copy Markdown
Owner Author

🤖 Powered by ework · qwen3.8-27b

(ai: vllm/qwen3.8-27b) Second merge-guard sync done: master advanced again (c499b14 → 7f2e119), so I rebased the empty commit onto the new master tip and force-pushed head → b5970bff2. PR is up-to-date with base (mergeable=true, no longer behind); mergeable_state=blocked is only because the full CI gate is now running on the new head (45 check runs launched) — intended pre-release-check behavior, not a conflict. No design decisions needed.

@ranxianglei

Copy link
Copy Markdown
Owner Author

🤖 Powered by ework · qwen3.8-27b

(ai: vllm/qwen3.8-27b) Third merge-guard sync done: master advanced again (7f2e119 → 9b6ec23, incl. version sync to 0.1.208 + #4904), so I rebased the empty commit onto the new master tip and force-pushed head → 0552dc335. PR is up-to-date with base (mergeable=true, no longer behind); mergeable_state=blocked is only because the full CI gate is now running on the new head (33 check runs launched) — intended pre-release-check behavior, not a conflict. No design decisions needed.

@ranxianglei
ranxianglei force-pushed the 2026-10-27_empty-pr branch 3 times, most recently from 0f58fa0 to c80b11f Compare October 31, 2026 03:21
@ranxianglei

Copy link
Copy Markdown
Owner Author

🤖 Powered by ework · qwen3.8-27b

(ai: vllm/qwen3.8-27b) Seventh merge-guard sync done. The local git mirror was flickering transient 502s during fetch this round, but the objects landed fine (verified tip object-graph complete via fsck before rebasing), and master had advanced in two steps — first to e5e2108, then to the final tip e193861 (+15 commits incl. #5294 second-writer-no-block / #5163 subagent-lane-discriminator) — so I re-rebased the empty commit onto the fresh tip and force-pushed head → 1466f029b. PR is now up-to-date with base (mergeable=true, no longer behind); mergeable_state=blocked is only because the full CI gate is running on the new head — intended pre-release-check behavior, not a conflict. No design decisions needed.

@ranxianglei

Copy link
Copy Markdown
Owner Author

🤖 Powered by ework · qwen3.8-27b

[bot] 🏷 Merge-guard sync #7 complete: rebased the empty commit onto master's fresh tip (e19386182) after a two-step advance plus a transient fetch blip, then force-pushed PR #4968 head → 1466f029b. PR is up-to-date with base (mergeable=true, no longer behind); mergeable_state=blocked is only the full CI gate running on the new head — intended pre-release-check behavior, not a conflict. No design decisions needed.

@ranxianglei

Copy link
Copy Markdown
Owner Author

Closing: this was an empty CI-trigger PR pinned to an old master tip (2026-10-27). Master has moved well past it; there is nothing to merge (empty diff).

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

ci:full Run the FULL CI matrix (all e2e lanes + 12-leg test matrix) on this PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant