exec-status-report

A Claude Code Skill that turns a project schedule plus this period's raw team progress notes into an executive-ready status report: an evidence-backed RAG rating, a risk register with owners and asks, and the decisions that actually need a call.

The problem

Status reports either take real synthesis (reconciling what teams actually said against the plan) or they don't — and the ones that skip it tend to either sugarcoat a real slip as "amber" because the number sounds small, or escalate everything to red because one off-critical-path task is late and nobody checked whether that task actually threatens the finish date. Both failure modes come from the same root cause: nobody re-derived the RAG rating from the schedule math, they just vibed it.

What it does

  1. You give Claude a schedule — critical-path-mapper's schedule.json is the natural source, since it already has planned dates, slack, and which tasks are on the critical path — plus this period's raw progress notes (standup notes, a Slack thread, whatever teams actually wrote).
  2. Following the rubric in skill/SKILL.md, Claude reconciles actuals against plan per task (finished late / behind plan / slack consumed / resolved early), assigns each epic a RAG status grounded in a specific number — days late, days of slack left — not a feeling, and rolls up an overall status from the worst load-bearing epic (one that actually contains a critical-path or near-critical task), so an off-path delay can't drag the whole project red.
  3. That judgment is written to one status.json file.
  4. A small deterministic script, skill/scripts/render_status.py, validates it (every status/severity value is a real enum, every risk has an owner and an ask) and renders:
    • status_report.md — the full exec-ready report
    • status_brief.md — a condensed version for pasting into Slack or an email

Same split as the first two projects: the model does the reconciliation and judgment call, plain code does the formatting — so re-rendering after editing status.json is instant, and the report can't drift out of sync with the data behind it.

Demo

examples/schedule.json is critical-path-mapper's worked example — the same "Nimbus Expense" backlog, already scheduled. Extending that story: examples/progress_updates.md is what the teams actually reported at the Aug 14 checkpoint, partway through the plan.

Result — examples/status.json, rendered to examples/output/:

🔴 RED. The critical path had already slipped one business day by the time this report was written (a zero-slack task hit an unplanned permissions issue, and the next zero-slack task on the chain absorbed that delay with no way to compress it further) — moving the finish date from 2026-08-20 to 2026-08-21. The report still surfaces the good news alongside it: a previously-open, PRD-unresolved compliance question got closed out the same week, and two epics are fully green. The report doesn't average those out — a real, unrecoverable slip on the critical path makes the project red regardless of what else went well, and the rationale says exactly why.

Using it

  1. Copy skill/ into your Claude Code skills directory (project-level: .claude/skills/exec-status-report/, or user-level: ~/.claude/skills/exec-status-report/).
  2. In Claude Code: "write a status report for this project" / "what's our RAG status" / "turn this schedule and these standup notes into an exec update."
  3. Claude writes status.json, then runs render_status.py to produce the report and the brief.
  4. Send status_brief.md for a quick update, or status_report.md when the detail (risk owners, specific asks, decisions needed) matters.

Requires only Python 3 (stdlib only, no dependencies) for the render step.

Design notes

  • RAG is a rubric, not a vibe. SKILL.md gives Claude specific, checkable conditions for red/amber/green (a confirmed slip with no recovery plan is red, full stop) instead of leaving "how bad is this" to a feeling — the same judgment the first two projects apply to story points and critical-path risk, applied here to status reporting.
  • Overall status is the worst load-bearing epic, not the worst epic. A red status on a task with 11 days of slack shouldn't make the whole project read as red; only epics that actually touch the critical or near-critical path can drag the overall rating down — mirroring critical-path-mapper's on-path/near-critical/off-path distinction.
  • Good news is part of the report, not an afterthought. The rubric explicitly asks for resolved risks and early finishes, not just what's late — a status report that only ever escalates isn't trustworthy either.
  • The renderer validates what the model can't guarantee. render_status.py rejects any status.json with an invalid RAG/severity value or a risk missing an owner or an ask, so a malformed judgment fails loudly instead of shipping a report with a blank cell where an accountable owner should be.

License

MIT — see LICENSE.

About

Claude Code Skill: turn a schedule + raw progress notes into an executive-ready status report with an evidence-backed RAG rating

Topics

Resources

Stars

Watchers

Forks

Releases

Packages

Contributors

Languages