Skip to content

refactor(api_client): unify get_bytes behind CalloutClient#492

Open
leseb wants to merge 6 commits into
praxis-proxy:mainfrom
leseb:leseb/fix-issue-454-core-bump
Open

refactor(api_client): unify get_bytes behind CalloutClient#492
leseb wants to merge 6 commits into
praxis-proxy:mainfrom
leseb:leseb/fix-issue-454-core-bump

fix(file_resolve): box internal futures to avoid large_stack_frames

539a863
Select commit
Loading
Failed to load commit list.
DCO-2 / DCO succeeded Jul 23, 2026 in 0s

Check passed!

All commits are signed off, the check passed.

Summary


Sha Message Pass or fail reason
🟢 f9ce775 refactor(api_client): unify get_bytes behind Callo... Valid sign-off found
🟢 2251cad Merge remote-tracking branch 'origin/main' into le... Skipped: sign-off not required in merge commit
🟢 b84b635 Merge remote-tracking branch 'origin/main' into le... Skipped: sign-off not required in merge commit
🟢 1f7ee02 Merge remote-tracking branch 'origin/main' into le... Skipped: sign-off not required in merge commit
🟢 8982096 Merge remote-tracking branch 'origin/main' into le... Skipped: sign-off not required in merge commit
🟢 539a863 fix(file_resolve): box internal futures to avoid l... Valid sign-off found