Skip to content

Deps: upgrade Biome from 1.9 to 2 #283

Open

Description

@wab

What to build

Upgrade Biome from 1.9.4 to 2.x with its migration command. No security finding is involved; Biome 1 is no longer maintained.

Biome 2 changes the import sorter and some formatting, so the diff touches most files. Blocked by the end of the redesign (J6) so the reformat does not conflict with open redesign branches.

Keep the config migration and the reformat in two separate commits, and add the reformat commit to .git-blame-ignore-revs.

Acceptance criteria

  • pnpm check passes on Biome 2
  • The config migration and the reformat are two separate commits
  • The reformat commit is listed in .git-blame-ignore-revs
  • No lint rule that was active on Biome 1 is silently disabled

Blocked by

Metadata

Metadata

Assignees

No one assigned

    Labels

    ready-for-agentFully specified, AFK-ready for an agent

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions