Repository navigation
Description
Parent
#212 (PRD: website redesign v2, delivery steps J1 to J6)
What to build
The redesigned method page. Its bow tie reads bowtie.activeStages from every published challenge file to drive a challenge filter. A visitor highlights the stages one challenge covers and compares challenges.
- The filter responds to hover, focus and tap.
- Stage tooltips use
Tooltip. - No copy says "Survolez".
Acceptance criteria
- Loader test: the method loader returns every published challenge and only those.
- The filter works with a keyboard and on tap.
- French and English render.
- The method page renders
UnifiedBowtiefrom the model in French and English: seven stages and the model's labels. "IMPACT" becomes Expansion, "QUALIFICATION" becomes Discovery, and Closing is added on the "Nouveau Client" knot. Moved from J2: bow tie with active stages, challenge colour and KPI tooltips #227 (J2: bow tie), which took it over from criterion 3 of J2: bow tie stage model with the seven Stage ids #220 (J2: bow tie stage model). -
LegacyBowtie(app/components/method/legacy-bowtie.tsx) and thescope.diagramkeys inlocales/fr/method.jsonandlocales/en/method.jsonare deleted.
Waiting for Ocobo
-
New bow tie copy. The method page keeps
LegacyBowtieuntil Ocobo signs off the seven stage labels and the KPI copy (open questions in J2: bow tie with active stages, challenge colour and KPI tooltips #227). This page switches to the new labels, so it waits for that answer. -
Revenue Systems grey (#767676 or #A1A1AA). PRD: website redesign v2, delivery steps J1 to J6 #212 holds this page until Ocobo answers, because it draws the Revenue Systems colour. Do not merge before the answer, unless the reviewer decides otherwise.
-
Note for the reviewer: the page lists only published challenges. The grey therefore shows only once the Revenue Systems file is on
postsmain. The reviewer may judge that this page need not wait. -
Darkened AI gradient text. The PR states whether this page uses gradient text. If it does, the page waits for Ocobo's approval of the darkened
gradients.ai-textvalues. -
The word "jalon" in stage tooltips. It does not hold this page.
-
English is machine-translated from French. Who reviews the English is an open Ocobo question; it does not hold this ticket.
Blocked by
- J2: bow tie with active stages, challenge colour and KPI tooltips #227 (J2: bow tie with active stages, challenge colour and KPI tooltips)
- J3: read challenge files through the content API #229 (J3: read challenge files through the content API)
Activity
[-]J5: method page with the enjeu filter on the bow tie[/-][+]J5: method page with the challenge filter on the bow tie[/+]fix(method): keep the production bow tie as LegacyBowtie until #243
wab commentedon Nov 3, 2026
Impact of the mockup update in ocobo-revops/prototype#26 (page-by-page feedback from Morgane). Mockup copy enters production only once Ocobo validates it (PRD content rule). The validation question is on #212.
wab commentedon Nov 9, 2026
The v2 navbar method panel (#322, for #315) dropped the maturity matrix chip under Framework: the method page has no matching section yet.
When this page is rebuilt, add a
#maturiteanchor on the maturity matrix section (withscrollMarginTop: '24', like#piliersand#perimetre), then add the chip back inchipsByKey.frameworkinapp/components/navbar-v2/method-panel.tsxand its label key inlocales/{fr,en}/common.json.