You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
J3: agent window demo and partner block in the challenge schema #230
#212 (PRD: website redesign v2, delivery steps J1 to J6)
What to build
The website challenge schema gains the two blocks the posts repo adds in ocobo-revops/posts#96 (Agent window demo in the challenge schema) and ocobo-revops/posts#97 (Partner block in the challenge schema).
aiBridge.demo. A frame (channel, agent, time, question, footer) and an ordered list of typed elements: KPI trio, highlighted figure, progress bar, status row (ok or alert), buttons. The schema caps the element count and each text length, since the window has a fixed height.
partner, optional. A Tool slug, a sentence, exactly two metrics and a required source.
Acceptance criteria
Schema test: an agent window with too many elements fails.
Schema test: an overlong text in the agent window fails.
Schema test: the partner block fails without exactly two metrics, or without a source.
The posts#96 and posts#97 fixtures validate against the website schema.
changed the title [-]J3: agent window demo and partner block in the enjeu schema[/-][+]J3: agent window demo and partner block in the challenge schema[/+]on Oct 21, 2026
Activity
[-]J3: agent window demo and partner block in the enjeu schema[/-][+]J3: agent window demo and partner block in the challenge schema[/+]test(content): pin the #230 placeholders to unknown keys