Top 10 CALIBER 2026, won The Most Innovative Team. Spare part intelligence for petrochemical plants. Sparely forecasts irregular demand by cause (failures, planned maintenance, turnarounds), warns early with ML, and sets cost–risk optimal Min–Max for every part, with safety rules and role workflows. Just enough, just in time.

Topics

Resources

Stars

0 stars

Watchers

0 watching

Forks

Repository files navigation

Sparely logo

Sparely

Just Enough, Just In Time.


Sparely banner



Sparely helps maintenance, inventory, procurement and management teams at a petrochemical plant keep the right spare parts in stock. It reads six SAP-style extracts, forecasts every spare part's demand by its cause (planned maintenance, equipment failure, turnaround), warns early which parts will be needed with a machine-learning model, and recalculates each part's Min, Max and safety stock by weighing holding cost against downtime risk. The result is not a dashboard but a worklist: one decision per part (reorder, transfer, reduce, monitor or maintain) that flows from the planner to procurement to management.

"Most tools forecast what you used. Sparely prepares you for what's coming, and proves it."

Design principles

  • Measure first, assume last. Every number that can be measured from the data is measured from the data. Assumptions are only used for what the data cannot tell, are listed openly, can be changed in the app, and are stress-tested.
  • Safety is a rule, not a cost. Parts that protect safety and shutdown valves are never left without a spare, whatever the cost model says.
  • Every decision is accountable. Recommendations come with numbered reasons, large decisions need management sign-off, and every approval is written to a decision log.
  • Proven, not promised. The policy is rebuilt from past data only and replayed against demand it never saw.

Background

36% of all spare parts issued in 17 months were consumed in a single 3-month turnaround window. 578 of 1,040 safety and shutdown valve locations are ranked at the lowest criticality. 60% of purchase orders arrive after the requested date, and every part has only one supplier.

This project answers CALIBER 2026 Final Case 3 — Spare Part Intelligence & Inventory Optimization. When a shutdown happens, the critical part is out of stock, while slow-moving parts sit on the shelf. Stock is planned reactively with static Min–Max levels that ignore what really drives demand. The result is emergency buying, tied-up working capital and longer downtime.

The baseline data (dummy SAP extracts from an ethylene cracker) shows four gaps:

  1. Demand is unpredictable with averages. Only 44 parts follow a regular pattern; 1,170 were issued in a single month and 5,625 never moved. Static Min–Max overestimates demand by 115%.
  2. Turnaround demand is mixed with routine demand. One turnaround spike inflates every forecast that follows it.
  3. Criticality alone misses safety. Most safety valve locations are ranked S, so a cost-only model would let their spares run out.
  4. Master data hides stock. 597 material numbers describe only 133 parts; in 66 groups one number shows zero stock while a twin holds stock.

Equipment criticality runs A > B > C > S (A is the most critical, confirmed by the organisers). "Critical" in the app means A or B, plus every safety-critical element.


Key Features

1. Demand Forecast by Cause

Demand is split into planned maintenance (from the maintenance plan, mapped to the parts each job replaces), failure-driven demand (recency-weighted compound Poisson, blended with an installed-base prior from equipment failure rates) and turnaround demand (detected from the data and kept out of the baseline). Parts that were never used still get a forecast from the equipment they are installed on.

2. ML Early Warning

A gradient-boosting classifier predicts which parts will be needed in the next 90 days. It is trained on monthly snapshots with features built only from data before each snapshot, and tested out-of-time.

3. Cost–Risk Optimization per Part

For every part, Sparely tries nine service levels, computes holding + ordering + downtime-risk cost, and picks the cheapest, including the option of not stocking at all. The probability that a stockout stops production is calibrated to the Emergency notifications observed in the data.

4. Identical Stock First

Before buying, Sparely checks whether a twin material number with the same description and unit holds stock above its own reorder point, and recommends a Transfer instead.

5. Turnaround Readiness

The last turnaround scope (360 parts) is detected from the data. The planner picks the next turnaround date; Sparely shows which parts will be short on day one and the latest order date for each.

6. Safety & Governance Guardrails

Safety-Critical Elements (parts on safety and shutdown valves) are always risk-rated as class A with at least one spare. Long-lead parts get a warning. Buys and reductions above Rp 1 billion, and any reduction of a safety-critical part, need management sign-off, and every decision is recorded in an audit trail.

7. Role-Based Workflow

Four workspaces hand work to each other, from recommendation to a purchase-requisition draft. There is no login: the prototype demonstrates the flow, not access control.

Workspace Who Does Hands off to
Maintenance & Reliability Maintenance planner, reliability engineer Checks part readiness for jobs due in 90 days, requests short parts, checks turnaround readiness, acts on ML warnings, decides insurance spares Procurement
Inventory Planner Inventory / MRP controller Uses identical stock first, approves reorders, new Min–Max and excess reductions Procurement, Management
Procurement Buyer Gets a PR draft (PR type, purchasing group, supplier from history), expedites open POs ERP (CSV)
Management Plant / supply-chain manager Signs off large buys and safety-critical reductions, reviews the decision log, decision impact and replay proof, sets the cost–risk scenario All workspaces
Maintenance  →  Inventory Planner  →  Procurement  →  Management
 readiness      approve / transfer      PR draft       sign-off, impact, policy

Results

All results come from the organisers' dummy baseline data (snapshot 1 Oct 2026).

Warehouse replay. The Sparely policy is rebuilt from data before 1 May 2026 only. Actual demand from May to September 2026 is then replayed day by day through two virtual warehouses with the same lead times and safety rules: one runs today's static Min–Max, the other the Sparely policy.

Metric Current Min–Max Sparely Change
Demand days fully served 68.6% 93.1% +24.5 pts
Stockout events 952 209 −78%
Stockouts on critical parts (A/B) 878 127 −86%
Average stock value held Rp 986.4 bn Rp 455.9 bn −54%

Forecast backtest (train May 2025 – Apr 2026, test May – Sep 2026):

Method WAPE Bias AUC
Static average (current practice) 1.336 +115.0% 0.769
Croston SBA (classical intermittent) 0.963 +57.7% 0.763
Sparely hybrid model 0.998 +9.5% 0.778

ML early warning (out-of-time test): AUC 0.895; parts scored at or above the 30% warning threshold were actually needed 74% of the time, against a 7.1% base rate.

Other impact: Rp 573.3 bn of excess stock can be released (PO prices only); 77 needs covered by identical stock (Rp 2.2 bn not bought); 860 safety-critical parts protected; 265 Non Stock parts recommended to become Stock Items.

Replay results compare two policies from their own starting points, because historical stock levels are not in the data. Stockouts are simulated, not observed. Full details: docs/03-optimization-engine.md.


How the Numbers Are Calculated

The machine-learning model ranks which parts to watch. Every number behind a stocking decision comes from a formula that can be checked in src/lib/engine.ts.

Calculation Formula
Failure-driven demand rate λ = c × λ_observed + (1 − c) × κ × E, with credibility c = n / (n + 2) and installed-base exposure E
Daily demand μ = λ × z (z = mean quantity per issue)
Lead-time demand μ_L = μ × L + planned demand within L
Reorder point (Min) ROP = μ_L + Φ⁻¹(SL) × σ_L (Poisson quantile for slow movers)
Safety stock SS = ROP − μ_L
Order quantity Q = √(2 × D × K / (h × P)), bounded between one month and one year of demand
Max Max = ROP + Q
Total cost per service level h × P × (SS + Q/2) + K × D / Q + stockouts/year × p_downtime × C_day × T_emergency
Downtime probability calibration Today's Min–Max must reproduce the 98.9 Emergency notifications per year in the data → A 1.07%, B 0.53%, C 0.16%, S 0.05%

AI Models

Model Purpose Method Validation
Demand forecast How much each part will need Cause-based hybrid: planned maintenance + recency-weighted compound Poisson + installed-base prior + turnaround separation Backtest on May–Sep 2026 vs static average and Croston SBA
ML early warning Which parts will be needed in 90 days HistGradientBoostingClassifier (scikit-learn), 20 features on part history, equipment, maintenance schedule, purchasing and category Out-of-time test on 14,962 part-months; AUC 0.895, calibrated
Abnormal-use detection Remove spikes before forecasting Robust z-score (MAD) Logged in data quality

Training runs offline in pipeline/ and writes results to data/caliber.db. The app reads the database and runs the optimization engine on every request. Full details: docs/02-forecast-and-ml.md.

AI research repository: early data and model experiments by our AI engineer (data cleaning, duplicate-material detection, lead-time quantile models, demand classification) are kept in sparepart-optimizer. The final numbers shown in the app and the deck come from this repository (Sparely), not from the research repository.

Note: the baseline data is dummy SAP data from the organisers. Models are not yet validated on real plant data; validation is part of the pilot.


Safety & Governance

Principle What is implemented
Process safety Parts on PRV- (safety valve) and SDV- (shutdown valve) locations are Safety-Critical Elements: class-A risk, at least one spare, never marked potentially obsolete
Delegation of authority Buys or reductions above Rp 1 billion, and any reduction of a safety-critical part, go to Pending approval and need management sign-off
Audit trail Every approve, reject, undo and sign-off is logged with role, time, quantity, value and reason; exportable as CSV
Human in the loop Sparely recommends; people approve. Nothing is written to the ERP automatically
Explainability Every recommendation carries numbered reasons (forecast, lead time, service level, risk, twins, ML warning)
Transparent assumptions All assumptions are listed on the Data & Method page with a live sensitivity table (halving or doubling them changes at most ~5% of actions)
Master-data governance A worklist for the SAP team: duplicate numbers, Non Stock parts that should be stocked, Stock Items that should not, Non Stock parts holding stock

Full details: docs/04-safety-and-governance.md.


Documentation

Additional project documentation is available in docs/:


Tech Stack

Layer Technology
Data pipeline & ML Python, pandas, NumPy, openpyxl, scikit-learn
Database SQLite (data/caliber.db, 26 tables)
Web app Next.js 15 (App Router), React 19, TypeScript
Database access better-sqlite3 (read-only)
UI Tailwind CSS 4, Recharts, lucide-react
Hosting Vercel (Node 22)
6 SAP extracts (xlsx)
      │  pipeline/build_db.py · pipeline/ml_model.py
      ▼   clean → link → demand features → forecast → backtest → ML early warning
data/caliber.db (SQLite, 26 tables)
      │  better-sqlite3 (read-only)
      ▼
src/lib/engine.ts · rules.ts · replay.ts · workflow.ts   (all parts re-optimize in well under a second)
      │
      ▼
Next.js workspaces + JSON API  →  Vercel

Project Structure

sparely/
├── pipeline/
│   ├── config.py          # every pipeline assumption
│   ├── build_db.py        # cleaning, linking, forecast, backtest, turnaround, identical parts
│   └── ml_model.py        # ML early warning
├── data/
│   └── caliber.db         # SQLite database
├── docs/                  # detailed documentation
├── src/
│   ├── lib/
│   │   ├── engine.ts      # stock optimization and action rules
│   │   ├── rules.ts       # safety & governance rules (SCE, long-lead, sign-off)
│   │   ├── replay.ts      # warehouse replay
│   │   ├── workflow.ts    # readiness, PR draft, impact, master-data list
│   │   └── params.ts      # default business assumptions
│   ├── app/               # pages and API routes
│   └── components/        # UI, charts, decision storage
├── scripts/               # engine sanity check, submission zip
└── raw-data/              # organiser Excel files (submission zip only)

Run Locally

Prerequisites

  1. Node.js 22+
  2. Python 3.11+ (only to rebuild the database)

Install and run

git clone https://github.com/narazla/Sparely
cd Sparely

# (optional) rebuild the database from the raw Excel files
pip install -r pipeline/requirements.txt
npm run build:data          # writes data/caliber.db

# web app
npm install
npm run dev                 # http://localhost:3000

The SQLite database is committed in data/caliber.db, so the rebuild step is only needed after changing the data or pipeline/config.py.

Deploy to Vercel

Live MVP: https://sparely-caliber2026.vercel.app (production deployment of 4 Nov 2026)

npx vercel login
npx vercel --prod

next.config.ts ships data/caliber.db with every serverless function and keeps better-sqlite3 as an external native module.


JSON API

Endpoint Description
GET /api/summary Portfolio KPIs, health and action counts, safety and governance counts
GET /api/recommendations?action=&health=&crit=A,B&tag=sce|longlead|signoff&q=&sort=&limit= Per-part recommendations (&format=csv to export)
GET /api/materials/{materialNo} Full detail, forecast, cost curve
GET /api/forecast Aggregate forecast, demand classes, backtest
POST /api/scenario Re-optimize every part for a cost–risk scenario
POST /api/pr-draft Purchase-requisition lines from approved buys
POST /api/impact Spend committed, transfers, capital released, downtime risk removed, decisions awaiting sign-off
GET /api/replay May–Sep 2026 warehouse replay
GET /api/data-quality Data-quality checks, assumptions, calibration
GET /api/master-data Master-data worklist (?format=csv for every row)

Roadmap

Phase Focus
1. Pilot One unit (e.g. the cracker): prove fewer critical stockouts and capital released
2. Plant-wide All units, integrated with turnaround planning
3. ERP integration Write PR drafts and Min–Max changes back to SAP; role-based login
4. Multi-site & cold start Share critical spares across sites; initial stock for new plants from the installed-base prior

Proposed additional data: maintenance task lists (SAP PM), standard material prices (SAP MM), production value per hour, stock and reservation history, approved vendor lists, functional-location hierarchy, and the official SCE register.


Known Limitations

  • The baseline data is dummy; some values are unrealistic (e.g. hundreds of governor valves in stock).
  • Historical stock levels and unmet demand are not recorded, so replay stockouts are simulated.
  • The maintenance plan does not list parts; planned demand is derived from the BoM with a calibrated usage factor (0.716).
  • 6,231 parts have no PO price; their prices are category estimates and labelled as such. Use PO-price figures (Rp 627.0 bn stock, Rp 573.3 bn excess) for rupiah claims.
  • Every part has a single supplier, so supply risk can be flagged but not re-routed.
  • The SCE list is derived from functional-location tags, not an official SCE register; the one-spare minimum is a starting rule.
  • Order-type prefixes, PR-type labels, FX rates, production loss per downtime day, holding-cost rate and cost per PO are assumptions not confirmed by the organisers; the effect of the last three is shown in the sensitivity table.
  • No login in the prototype; decisions and the decision log are stored in the browser (a shared database in the pilot).

Team


Nazla Azzahra
Universitas Diponegoro

Syahla Sandiani
Universitas Diponegoro

Helmi Abdulbaqi
Universitas Diponegoro

Built for CALIBER 2026 — Final Case 3: Spare Part Intelligence & Inventory Optimization

About

Top 10 CALIBER 2026, won The Most Innovative Team. Spare part intelligence for petrochemical plants. Sparely forecasts irregular demand by cause (failures, planned maintenance, turnarounds), warns early with ML, and sets cost–risk optimal Min–Max for every part, with safety rules and role workflows. Just enough, just in time.

Topics

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages