-
Notifications
You must be signed in to change notification settings - Fork 0
All issues
Issue creation is restricted in this repository
Issues
is:issue state:open
is:issue state:open
Search results
Add a second physically brought-up golden board
hardware neededFabrication or bench hardware requiredFabrication or bench hardware requiredhelp wantedExtra attention is neededExtra attention is neededvalidationBench or lab validation evidenceBench or lab validation evidenceStatus: Open.#6 In mrcha033/hw-codesign;Fabricate and bring up the first golden board
hardware neededFabrication or bench hardware requiredFabrication or bench hardware requiredhelp wantedExtra attention is neededExtra attention is neededvalidationBench or lab validation evidenceBench or lab validation evidenceStatus: Open.#5 In mrcha033/hw-codesign;Add fresh supplier evidence for the golden BOM
enhancementNew feature or requestNew feature or requesthelp wantedExtra attention is neededExtra attention is neededsourcingSupplier and component availability evidenceSupplier and component availability evidenceStatus: Open.#4 In mrcha033/hw-codesign;Qualify the U2.57 via-in-pad fabrication process
electronicsElectrical design and PCB workElectrical design and PCB workhardware neededFabrication or bench hardware requiredFabrication or bench hardware requiredmanufacturingFabrication and assembly process evidenceFabrication and assembly process evidenceStatus: Open.#2 In mrcha033/hw-codesign;