Skip to content

chore(llm-slo-decision-gen): bump slo-api to 0.3.0 - #97

Merged
remotego merged 1 commit into
mainfrom
chore/llm-slo-api-0.3.0
Nov 2, 2026
Merged

remotego merged 1 commit into
mainfrom
chore/llm-slo-api-0.3.0

Conversation

@remotego

@remotego remotego commented Nov 2, 2026

Copy link
Copy Markdown
Collaborator

What type of PR is this?

  • chore / dependency bump
  • documentation

What this PR does and why

Moves the chart's slo-api image to 0.3.0. That release:

Before this, the chart shipped CRDs that allow all three while slo-api 0.2.0 refused them. The slo-api ClusterRole already grants jobslorequirements, so no RBAC change is needed.

  • values.yaml: sloApi.image.tag goes from 0.2.0 to 0.3.0, and the comment says what 0.3.0 adds.
  • Chart.yaml: version goes from 0.3.7 to 0.3.8. appVersion stays at decision-gen's 0.8.0.
  • README.md: the two slo-api rows still said v0.1 / "do not enable". slo-api has been on by default since the 0.2.0 image, so the rows now describe what the chart renders.

Which issue(s) this PR fixes

Refs modelsphere/slo-api#8, modelsphere/slo-api#9

How it was tested

  • helm lint --strict charts/llm-slo-decision-gen → 1 chart(s) linted, 0 chart(s) failed
  • helm template ci charts/llm-slo-decision-gen | grep llm-slo-api: → image: "4pdosc/llm-slo-api:0.3.0"
  • hack/check-chart-version.sh origin/main → exit 0
  • 4pdosc/llm-slo-api:0.3.0 is on Docker Hub (amd64, arm64), published by the release run. check-chart-images.sh runs in CI because crane is not installed locally.

Checks

  • Chart version bumped
  • Docs updated where behaviour, a config key or a chart value moved
  • No internal hostnames, IPs, registries or credentials

🤖 Generated with Claude Code

slo-api 0.3.0 serves JobSLORequirement routes and accepts the pdengine
bound type and bound value 0, which the chart's CRDs already allow. The
README's slo-api rows still described v0.1 as unusable; slo-api has been
on by default since the 0.2.0 image.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@remotego
remotego merged commit f8bdfab into main Nov 2, 2026
4 checks passed
@remotego
remotego deleted the chore/llm-slo-api-0.3.0 branch November 2, 2026 00:38
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant