Project ARGON

SecureBridge ISO 27001 GRC Portfolio

Building, operating, auditing, and improving an ISO/IEC 27001:2022 Information Security Management System — end to end, across ten connected projects, consolidated into one integrated command center.

Engagement Standard Annex A Projects Readiness Scope Data License


▶ Start Here: The Integrated ISMS Command Center

Project 11 consolidates all ten projects into a single executive view. If you read one thing in this repository, read that.

From business context to certification readiness: an integrated, evidence-driven ISMS implementation portfolio.

Integrated ISMS Command Center

Interactive dashboard Six tabs, filterable registers, 5×5 risk heat map — standalone HTML
Executive summary Company, scope, key risks, readiness, decisions required
Master risk and control view 16-field risk register and the full Statement of Applicability
Certification readiness 44.6 / 100 weighted · six blocking risks · not certified
Traceability matrix One risk followed through eleven layers, including where the chain breaks

The consolidation imports the ten project datasets rather than restating them, so no integrated figure can drift from its source register. Three required views — asset inventory, incident management, and management review — have no source project and are labelled Demonstration throughout rather than invented.


What This Is

A practitioner portfolio that demonstrates how a cybersecurity professional designs, runs, measures, and improves an ISMS in a realistic company — not a set of theory notes and not a template pack.

The setting is SecureBridge Technologies Pvt. Ltd., a fictional 80-person cybersecurity and managed IT services company in Surat, Gujarat. It sells security services to SMEs, yet in January 2026 it could not evidence its own security governance: no documented scope, no risk register, no Statement of Applicability, no evidence trail. Three clients began demanding proof of a certified ISMS at renewal.

The ten projects in this repository are the work that closes that gap.

Why it matters Certification is won or lost on evidence and traceability, not on documents existing. Every artefact here is built so an auditor can trace a management-review claim down to the record that supports it.
What was created Policies, registers, risk assessments, control mappings, audit programmes, corrective-action tracking, supplier assurance, dashboards, and diagrams — as Markdown, Word, Excel, and SVG.
Skills demonstrated Risk-based thinking · control ownership · evidence management · audit readiness · corrective action · supplier risk · management reporting · documentation control.

Portfolio Dashboard

ISMS Portfolio Dashboard

ISMS position as at 04-Sep-2026 — Phase 8 of 12. All figures illustrative. No external audit has been performed and no certificate exists. Source data: 00-Portfolio-Overview/README.md.


Business Scenario

Attribute Detail
Organization SecureBridge Technologies Pvt. Ltd. (fictional)
Sector Cybersecurity services and managed IT
Headquarters Surat, Gujarat, India · second office in Ahmedabad
Headcount 80 employees
Service lines VAPT · Managed security monitoring · Cloud security consulting · IT support
Customers Small and medium enterprises across India
Cloud estate AWS ap-south-1 (Mumbai) · Microsoft Azure Central India
Working model Company-managed laptops · approved hybrid and remote working
ISMS initiated January 2026 · readiness target Q2 2027 (Planned)

Full detail: 00-Portfolio-Overview/company-context.md


Objectives

  1. Establish a bounded, justified ISMS scope tied to how the business actually operates.
  2. Build a risk register with approved criteria, scored risks, named owners, and treatment plans.
  3. Assess all 93 Annex A controls for applicability and record the justification in a Statement of Applicability.
  4. Publish a controlled policy and procedure set with owners, versions, and review dates.
  5. Implement controls proportionate to an 80-person company with a constrained budget.
  6. Generate and index retrievable evidence for every control claimed as implemented.
  7. Run an internal audit programme that produces objective, classified findings.
  8. Close findings through root-cause analysis, corrective action, and effectiveness verification.
  9. Report ISMS performance to management in a form that supports real decisions.
  10. Consolidate everything into a defensible certification-readiness position.

ISMS Scope

In scope — the provision of VAPT, managed security monitoring, cloud security consulting, and IT support services from the Surat and Ahmedabad offices, including supporting corporate functions, the Microsoft 365 and Entra ID tenant, the AWS ap-south-1 and Azure Central India environments, company-managed endpoints, and approved remote-working arrangements.

Out of scope — client-owned infrastructure under full client control, third-party data-centre physical security beyond contractual assurance, and personally owned devices, which are not permitted for company or client data.


Portfolio Architecture

Portfolio architecture and dependency map

Ten projects mapped to Plan-Do-Check-Act. Each lives in its own numbered folder and is readable on its own, but outputs flow forward: risk → control → evidence → improvement. The eleventh folder consolidates all ten into a single certification-readiness view and is built last.


Repository Structure

SecureBridge-ISO27001-GRC-Portfolio/
│
├── README.md                        ← you are here
├── LICENSE
├── .gitignore
│
├── 00-Portfolio-Overview/           Shared foundation inherited by every project
│   ├── README.md                    Portfolio dashboard and navigation
│   ├── company-context.md           The organization: roles, services, technology, scope
│   ├── portfolio-standards.md       Palette, terminology, identifiers, metadata rules
│   ├── portfolio-roadmap.md         Ten project slots, PDCA placement, delivery status
│   ├── isms-implementation-journey.md   Twelve-phase timeline, Jan 2026 → Q2 2027
│   ├── diagrams/                    Organization · architecture · timeline (SVG)
│   └── screenshots/                 Rendered dashboard preview (PNG)
│
├── 01-Project-01/  …  10-Project-10/    One folder per project
│   ├── README.md                    Purpose · portfolio role · skills · deliverables
│   ├── documents/                   Word deliverables and Markdown equivalents
│   ├── spreadsheets/                Excel registers, trackers, dashboards
│   ├── diagrams/                    Process flows, matrices, traceability (SVG)
│   ├── evidence/                    Illustrative evidence artefacts and evidence index
│   └── screenshots/                 Rendered PNG previews
│
└── 11-Integrated-ISMS-Portfolio/    Consolidation of all ten — built last
    ├── executive-summary/
    ├── integrated-isms-manual/
    ├── master-risk-and-control-view/
    ├── master-evidence-map/
    ├── certification-readiness-report/
    ├── management-review-pack/
    ├── cross-project-traceability/
    ├── portfolio-diagrams/
    ├── dashboards/
    └── screenshots/

Delivery Status

# Project PDCA stage Status
01 ISMS Scope Definition Plan ✅ Delivered
02 Context of the Organization Plan ✅ Delivered
03 Risk Assessment Plan ✅ Delivered
04 Statement of Applicability Plan ✅ Delivered
05 Information Security Policy Pack Do ✅ Delivered
06 Internal Audit Check ✅ Delivered
07 Certification Readiness Evidence Map Check ✅ Delivered
08 Supplier Risk Review and Third-Party Security Assessment Do ✅ Delivered
09 Security Awareness Metrics Dashboard Check ✅ Delivered
10 CAPA Register and Continual Improvement Log Act ✅ Delivered
11 SecureBridge Integrated ISMS Command Center Consolidation ✅ Delivered

Project titles and PDCA placement are confirmed as each brief is issued, from the ISO clause the project addresses. Tracked in portfolio-roadmap.md.


Main Project Workflow

How a single project is produced (click to expand)
  1. Frame — confirm the project's PDCA stage, the ISO 27001 clauses it addresses, and which earlier project outputs it consumes.
  2. Design the artefacts — decide which registers, documents, diagrams, and evidence items the project must produce for the ISMS to actually work at that stage.
  3. Populate with consistent data — draw company facts from company-context.md and reuse existing identifiers. A risk cited in an earlier project keeps the same ID, score, and owner.
  4. Build the deliverables — Markdown for GitHub readability, .docx / .xlsx for the real working artefacts, SVG for diagrams.
  5. Render previews — dashboards and registers are rendered to PNG so the outputs are visible without downloading anything.
  6. Label provenance — every figure is tagged Illustrative, Assumed, Sample, Planned, Not Yet Implemented, Evidence Required, or To Be Verified.
  7. Cross-link — record what the project feeds into, so Project 11 can consolidate without rework.
  8. Verify — check terminology, identifiers, dates, and chart-to-table consistency against portfolio-standards.md.

Key Illustrative Outcomes

The position the portfolio moves the organization to, as at 04-Sep-2026:

Indicator Jan 2026 baseline Sep 2026 current Q2 2027 target Source
Documented ISMS scope None Approved Approved SBT-SCP-01
Internal and external issues determined 0 20 20+ SBT-CTX-01
Risks recorded and owned 0 10 40+ SBT-RSK-01
Annex A controls assessed for applicability 0 of 93 13 of 93 93 of 93 SBT-SOA-01
Policies drafted / approved 0 / 0 6 / 0 14 / 14 SBT-POL-00
Internal audits completed 0 0 2 SBT-AUD-01
Evidence items rated Green in the readiness map 0 14 of 75 (19%) 95% SBT-EVM-01
Suppliers with a completed security assessment 0 0 of approximately 26 All, once enumerated SBT-SUP-01
Staff completing annual awareness training Not tracked 95% for the Jul–Aug 2026 cycle 98% SBT-AWR-01
CAPA items recorded, owned, and tracked 0 8 — 1 closed, 2 overdue All closed within target SBT-CAP-01
Continual improvement items recorded 0 10 — 1 complete Reviewed each quarter SBT-CAP-01

All figures are illustrative, generated for demonstration, and each current-position figure is traceable to the named register. They are not measurements of a real organization.

The honest headline. Ten projects in, SecureBridge has a defensible plan, one control that is actually operating, and a mechanism for resolving what the rest of the portfolio found. Its scope, context, risk assessment, and control selection are approved. The awareness programme has been delivered and measured — A.6.3 is the first control to move on operational evidence rather than documentation. The CAPA register has closed one finding with independent verification and reopened another when verification found it wanting, which is the more important of the two.

What remains on paper is still most of it: policies drafted and unapproved, no audit conducted, no management review held, no supplier review completed, two High-priority corrective actions overdue. The portfolio's closing position is not that the ISMS works — it is that the organization can now tell whether it does, which is the precondition for everything else.


Standards and Frameworks Referenced

Framework Edition Role
ISO/IEC 27001 2022 Primary certification standard — Clauses 4–10
ISO/IEC 27002 2022 Implementation guidance for the 93 Annex A controls
ISO/IEC 27005 2022 Information security risk management method
ISO 31000 2018 Enterprise risk management principles
ISO/IEC 27035 2023 Information security incident management
ISO 19011 2018 Guidance for auditing management systems
NIST CSF 2.0 Cross-mapping and control-maturity framing
CIS Controls v8.1 Technical safeguard benchmarking
DPDP Act (India) 2023 Personal data protection legal context

Annex A structure used throughout: 93 controls in 4 themes — Organizational (A.5, 37), People (A.6, 8), Physical (A.7, 14), Technological (A.8, 34).


Tools Used

Purpose Tool
Controlled documents Microsoft Word (.docx) with Markdown equivalents for GitHub
Registers, trackers, dashboards Microsoft Excel (.xlsx) with native charts and conditional formatting
Diagrams Hand-authored SVG — version-controlled, text-diffable, resolution-independent
Dashboard previews HTML rendered headlessly to PNG
Version control Git

How to Review This Project

In five minutes — read this page, then the dashboard in 00-Portfolio-Overview/README.md.

In twenty minutes — add company-context.md for the organization and isms-implementation-journey.md for the problem being solved, then open any delivered project folder's README.

In depth — start at portfolio-standards.md to see the conventions, then trace a single risk ID forward through the projects: risk → control → evidence → audit finding → corrective action. That trace is the point of the portfolio.


Limitations and Assumptions

  • SecureBridge Technologies Pvt. Ltd. is fictional. No real organization, client, supplier, auditor, or certification body is represented.
  • All data is illustrative. Risk scores, control coverage percentages, training completion rates, and audit findings are constructed to demonstrate method, not to report real measurements.
  • No certification exists. No external audit, Stage 1 or Stage 2 assessment, accreditation, or certificate is claimed. Items dated after 04-Sep-2026 are labelled Planned and have not occurred.
  • Evidence artefacts are samples. Where evidence is shown, it is an illustrative artefact created for the portfolio, not a real system record.
  • Constrained by scenario design. The organization is deliberately given limited budget and no dedicated compliance headcount, so control choices favour process and configuration over tooling spend.
  • Not legal or certification advice. This portfolio demonstrates practice; it is not a substitute for a qualified assessment against ISO/IEC 27001.

Future Improvements

  • Complete all ten projects, then build 11-Integrated-ISMS-Portfolio/ as the consolidated view.
  • Extend the master evidence map into a full clause-to-evidence traceability matrix covering Clauses 4–10.
  • Add a second annual ISMS cycle to demonstrate continual improvement across two full PDCA rotations.
  • Map the control set to a secondary framework (SOC 2 Trust Services Criteria) to show multi-framework control reuse.
  • Add automated consistency checks that validate identifiers, dates, and status vocabulary across folders.

Disclaimer

This is a fictional portfolio project created for professional demonstration purposes.

SecureBridge Technologies Pvt. Ltd. does not exist. All companies, people, clients, suppliers, assets, incidents, audit findings, metrics, and dates are invented and clearly labelled as illustrative. Nothing in this repository represents a real audit, a real certification, a real approval, or the security posture of any actual organization. No certification body, accreditation mark, or auditor is named or implied.

The material demonstrates ISMS design, operation, and improvement practice. It is not certification advice and must not be relied on as an assessment of conformity to ISO/IEC 27001.


SECUREBRIDGE · Technologies Pvt. Ltd. Fictional organization · Portfolio project · Licensed under MIT

About

An interactive, evidence-driven ISO 27001 Integrated ISMS portfolio for SecureBridge Technologies Pvt. Ltd., connecting governance, risk, controls, policies, audits, evidence, management review, and certification readiness across 10 interconnected GRC projects.

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors