Skip to content

fix(zombies): validate pinned Killhouse navigation overlay - #16

Merged
ghptc merged 1 commit into
masterfrom
fix/zombies-killhouse-navigation
Oct 27, 2026
Merged

ghptc merged 1 commit into
masterfrom
fix/zombies-killhouse-navigation

Conversation

@ghptc

@ghptc ghptc commented Oct 27, 2026 •

Copy link
Copy Markdown
Owner

Accept the narrowly pinned private Killhouse PeZBOT overlay without bypassing the existing BTD packaging identity checks. New preparations must declare the exact source hash and exact three-overlay set. Missing, modified, extra, unpinned or symlinked navigation is rejected. Legacy two-overlay preparations remain supported only without navigation declarations/files and without requested Killhouse.

Root cause is a padded terminal cell (end at table key 4928), not missing graph data. The engine companion repairs only that precise map/table/offset/count/value during private preparation; original assets and graph data remain unchanged.

Validation: all 50 workspace Python tests, 22 catalog/packaging tests, complete mocked operations suite, and whitespace checks pass. Actual privately prepared runtime passed existing 15-map BTD integration (71/71) with this contract. Independent review passed. No CI definitions, deployment services, map lists, rotation, production or running services changed.

Require green mandatory Operations tests and owner approval before merge. Killhouse remains excluded pending supervised real-client qualification in explicitly authorized homologation. This PR alone does not qualify or activate the map. Rollback retains legacy preparations and reverts this focused contract update through the existing reviewed process.

Engine companion: ghptc/cod4x-server#23. Final exact-code native Killhouse regression passed12/12 (/tmp/btd-navigation-bp4wboij), original failure control2/2 (/tmp/btd-navigation-_0ak_ar_); independent code/evidence review passed. No rotation change; real-client supervised qualification remains required.

Handoff CI: required engine Linux check and workspace Operations tests passed on the final committed heads (c425838 / 0fd299e). The additional engine Windows build was still running when checked. Owner approval/manual merge and real-client homologation qualification remain outstanding; Killhouse remains excluded.

@ghptc
ghptc merged commit da5360d into master Oct 27, 2026
1 check passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant