Milestones
List view
Graduate vinext from Beta to Stable inside the v2 line (Stable on the official suite minus N disclosed known-gap files). Does not gate the 2.0 GA.
No due date•4/8 issues closedv2.0: the 1.x contract-cleanup major (alias removal, test-only exports, Next/Node floors) plus zone functions in Go/Rust at Beta. Sprints are scope-bound: only Sprint 1 is firm; later work is re-planned at each sprint close. GA when this milestone's tasks are done.
No due date•131/251 issues closedProfessional Services listing + free operator listing (container product, then EKS add-on). Plan: AWS Marketplace plan 2026-10-07.
No due date•4/12 issues closedGet knext client-ready for 'deploy Next.js on your existing Kubernetes' engagements. Source: consulting-readiness evaluation 2026-10-07.
No due date•8/12 issues closedvinext becomes credentialed on both runtimes: vinext × bun (compiled single executable, bun --compile --bytecode) and vinext × node (V8 compile cache baked into the image) pass the official Next.js deployment suite for 14 consecutive nights, alongside the four v1.0 cells.
No due date•2/23 issues closedFirst post-GA release: fixes that change published bytes and could not land during the v1.0 credential window.
No due date•8/18 issues closedProtect the rc.2 credential windows and the publish path first, then consolidate. Plan: architect + system-designer brainstorm, jev-prioritized (P0/P1/P2 labels). No features. Frozen credential files change only in the rc.2 harness batch.
Overdue by 12 day(s)•Due by October 13, 2026•59/76 issues closedSprint 2026-10-12 → 10-25 (GA runway): rc.2, GA readiness checks, Next.js listing draft, docs launch pass, announcement kit. GA cut + listing submission follow once rc.2 reaches 14/14 on all four cells.
Overdue by 1 day(s)•Due by October 24, 2026•32/32 issues closedApproved plan 2026-09-26: both compiled shapes (Next standalone lead, vinext nitro) self-contained from an empty dir, opt-in; shared foundation F1-F6, tracks N1-N3 / V0-V3; done = OKE cold-start win + compat parity. Map: ~/.claude/plans/eager-churning-garden.md
No due date•31/52 issues closedConsolidate, don't add. Task graph and exit criteria: .claude/research/sprint-techdebt-stability-2-plan.md (tracks A guards-that-lie, B soft pins/CI guards, C retire shims, D operational stability, E governance drift, F merge-train tooling, G previous sprint close). Pre-condition: land the 15 reviewed PRs. Done when the mutation-prover lane is green 3 nights, no PR predates the sprint, every touched guard is mutation-proved by exit code, S6 retired, hygiene runs as tested scripts. ~2 weeks from the Sep 29 quota reset.
No due date•5/26 issues closedFinish Runtime-Axis credentialing: wire all 6 runtime×builder credential lanes, land every pre-freeze fix, cut rc.1 (ADR-0056), start the 14-night windows. Plan: 3–5 weeks (flake math). Task graph from the 2026-09-24 architect + system-designer gates.
No due date•51/65 issues closedRatchet the HONEST line coverage (ADR-0057: executable lines only) to 95% (founder decision 2026-09-23). Raw floors stay a never-lower ratchet. Floors only go up, no exclusions, no padding tests.
No due date•6/13 issues closedCredential the ADR-0054 bun-standalone axis: scheduled Bun-1.4.0 lane -> official-suite green streak (the verified-adapter north star), + reconcile rules/ADRs. jev 0.94.
No due date•26/28 issues closedOnboarding front-door: make the anonymous-user quickstart actually work (jev-ranked DX sprint). #707 install path, #794/#952 pull secrets, create/npx polish, agent-skills.
No due date•22/32 issues closedA4, A5, B3, C3, C4 — cold-start hardening, DB wake resilience, troubleshooting, tracing, structured logs.
No due date•5/5 issues closedA3, B1, B2, C2 — SLOs, day-2 runbook, CR health status, dashboards.
No due date•4/4 issues closedA1, A2, C1, B4 — validate the headline claims (multi-cloud, operator HA, golden-signal metrics, published semver).
No due date•3/4 issues closedEdge / partly upstream-gated. Deferred during the fame phase.
No due date•2/2 issues closedPlatform hardening — security defense-in-depth, deploy lifecycle (previews/rollback/skew/RUM), s2s authz, observability.
No due date•7/7 issues closedFinish the correctness north star — operator lifecycle, real-cluster e2e, portability, compat matrix.
No due date•8/8 issues closedUnblock outside adoption and earn verified-adapter credibility. Highest leverage for the fame-first phase.
No due date•4/4 issues closedDrop vinext from the build pipeline. Ship native Next.js standalone → @vercel/nft embed → bun --compile --bytecode → single binary. Audit-clean supply chain. Risk-out: Node 22 + NODE_COMPILE_CACHE if Bun pipeline fails empirical validation.
Overdue by 3 month(s)•Due by July 4, 2026•14/14 issues closed