Skip to content

docs: retire dataflow-logic-visibility - #387

Merged
byronwall merged 1 commit into
retire/python-dataflowfrom
retire/dataflow-logic-visibility
Nov 13, 2026
Merged

byronwall merged 1 commit into
retire/python-dataflowfrom
retire/dataflow-logic-visibility

Conversation

@byronwall

@byronwall byronwall commented Nov 13, 2026 •

Copy link
Copy Markdown
Owner

Retire the dataflow-logic-visibility initiative. All five milestones merged on 2026-10-29 (#268, #272, #274, #278, #279). The planning folder docs/intent/dataflow-logic-visibility/ is removed, its lasting facts move into the docs, and docs/initiative-history.json gets its closure record.

What to do with it

Reference only. Merge to remove a finished plan that could mislead later planning.

  • Durable facts went to a new "Symbol view of an anchor trace" section in docs/dataflow-coverage.md; the public site link is pinned to the last revision.
  • Not delivered, recorded in the closure record: Run audit round 3 on visual-notes against the symbol view. Nothing tracks it. Below the cut line and not built: a types overlay, the symbol view in the Components lens, Python frame roles. Hub summaries are tracked as pgm task-hub-summaries-for-size-limited-slices.

Proof

  • Anchor traces in TS/TSX data flow now draw one box per symbol, name what happens along each edge, color symbols by kind, give frames a role, open on the main path and grow by depth, and link functions to what they call, read and write. Reconciled against origin/main 0bfb05b.
  • Every milestone maps to a merged PR, checked against gh pr list --state merged and the code on origin/main 0bfb05ba.
  • validate-sleuth.mjs docs/intent/dataflow-logic-visibility --retirement: Validation passed before the folder was removed.
  • The docs site builds and its 5 Playwright tests pass on the stack top (cd site && pnpm build && pnpm test).
  • Docs only. No code changed, so app tests were not rerun.

Stack: retire shipped initiatives, layer 13 of 14

This slice: Retires dataflow-logic-visibility.
Why it is its own layer: Each retirement has its own closure record and validator run.
Full story: #375

🤖 Generated with Claude Code

All five milestones merged on 2026-10-29 (#268, #272, #274, #278, #279).
Move the durable facts into the lasting docs, add the closure record
to docs/initiative-history.json, and remove the planning folder.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@byronwall
byronwall added this pull request to stack #389 November 13, 2026 03:00
@byronwall
byronwall marked this pull request as ready for review November 13, 2026 03:01
@byronwall
byronwall merged commit 3f57d8b into main Nov 13, 2026
10 of 11 checks passed
@byronwall
byronwall deleted the retire/dataflow-logic-visibility branch November 13, 2026 03:10
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant