Repository navigation
fix(channels): leave Option+Up/Down to text fields outside the composer - #2765
Merged
cheng-block merged 2 commits intoNov 16, 2026
Merged
Block DCO Check / DCO Check
succeeded
Nov 16, 2026 in 0s
All PR commits have appropriate sign-off
All commits in this PR have the appropriate sign-off. No further action is required
Details
all commits have the required DCO sign-off.
Loading