Skip to content

CRITICAL-HALF: Green/tree/scattering bridge and shorted NP prolate front - #116

Draft
Waschtl904 wants to merge 18 commits into
mainfrom
research/critical-half-green-tree-bridge-2026-09-13
Draft

CRITICAL-HALF: Green/tree/scattering bridge and shorted NP prolate front#116
Waschtl904 wants to merge 18 commits into
mainfrom
research/critical-half-green-tree-bridge-2026-09-13

Conversation

@Waschtl904

Copy link
Copy Markdown
Owner

Scope

Research branch after NULLPOL-COMMON. Adds theorem-level structural audits for the critical-half Green/tree/Poisson/scattering architecture and reduces the remaining fixed-window NP-GAP problem to a rank-2-shorted weighted prolate/Birman–Schwinger certificate.

Key exact results include:

  • NULLPOL = Range(-d^2+1/4) on compact windows;
  • P11 AR(1)/hub-rest as the sampled critical-half Green/OU tree;
  • pole transfer, Gamma resolvent ladder, finite-part diagonal mass, Poisson/scattering phase;
  • pointwise scattering-positivity no-go;
  • monotonicity of the centered gap under window exhaustion;
  • exact rank-2 Paley–Wiener shorting and trace-class negative block;
  • trace-minus-Ritz certification lemma for a rigorous a=1/2 prolate test.

Nonclaims

  • no all-window NP-GAP proof;
  • no RH proof;
  • no Registry promotion;
  • floating/Nyström margins in the latest audits are diagnostics only until Arb-certified;
  • publication novelty remains open.

Keep as Draft while the a=1/2 Arb certificate is built and reviewed.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant