Skip to content

ci: release Atlas consumers from unrelated shard waits - #444

Merged
afflom merged 1 commit into
release/v0.4from
dot/atlas-shard-prerequisites-20261109
Nov 10, 2026
Merged

afflom merged 1 commit into
release/v0.4from
dot/atlas-shard-prerequisites-20261109

Conversation

@afflom

@afflom afflom commented Nov 9, 2026

Copy link
Copy Markdown
Member

Change

Split the first Atlas matrix by the prerequisites already declared in .github/verify-shards.json:

  • cert4 runs in its own job, so cert4-replay starts as soon as its input is ready.
  • census-a and census-b remain one matrix. closure waits for them and cert4.
  • census-c and census-d run in a separate matrix and still block the final join.

There are still 14 expanded Atlas jobs, with identical check names, commands, environments, artifact names and retention settings. Every shard still runs once. The complete join, honesty dependency, clean-checkout policy, all acceptance tests and release-evidence checks stay intact. No semantic identity or generated record changes.

Reason

In successful run 42596285175, cert4 finished at 10:24:53 UTC and census-a/b by 10:31:48. Both consumers waited until 10:41:54 because the shared matrix also contained census-c. That is approximately 17 minutes of avoidable replay waiting and 10 minutes of closure waiting. These are observed dependency delays, not measured savings from this patch. Intel macOS dominated that run's total time; no overall CI speedup is claimed.

Verification

Passed locally against base 4dc5b803c5b0771f9f19563373515d0a2c2f313a:

  • YAML parsing with duplicate-key rejection and shell syntax checks.
  • Expanded old/new Atlas job equivalence, excluding only scheduling dependencies.
  • Exact shard inventory and every prerequisite in the committed plan.
  • Final join depends on every shard, so any failed shard still blocks publication.
  • Negative probes removing a real prerequisite or the census-tail join dependency were rejected.
  • RP-14's dynamic job/condition counts remain consistent; non-Atlas jobs and workflow triggers are unchanged.

The existing RP-14 and RP-18 implementation was reviewed; neither needs a source change. Cargo, Lean and just vv were not run in this workspace. Hosted CI remains required. This starts as a draft, whose reduced CI is a development signal only; full acceptance is still required before merge.

Ownership

This branch owns only the Atlas scheduling change. The current open PR inventory has no overlapping scheduling carrier. The v0.5 integration and regeneration lane remains #405's.

@afflom
afflom marked this pull request as ready for review November 9, 2026 15:41

@afflom afflom left a comment

Copy link
Copy Markdown
Member Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Source review of 63b9093 found no blocking issue. The 14 expanded shard executions preserve their names, environment, steps and artifacts. The committed plan's prerequisites are all reachable, the join still requires every shard including census-c/d, and failure propagation, honesty, same-run artifact custody and release-evidence behavior remain intact. RP-14's dynamic source assertions and RP-18's release gate do not depend on the old matrix grouping. Local syntax/equivalence checks and missing-prerequisite/incomplete-join negative probes pass.

The initial draft's honesty and exact-head reproducibility passed. After source review, the PR was marked ready to start the full acceptance run: https://github.com/UOR-Foundation/LexLean/actions/runs/42647185072 . Concurrency cancelled the superseded reduced draft run. This review does not substitute for full hosted acceptance, which remains pending; no merge or measured overall speedup is claimed.

afflom commented Nov 9, 2026

Copy link
Copy Markdown
Member Author

The complete ready-event run 42647185072 is terminal: 44 jobs passed, and Intel macOS job129265555619 was cancelled. All Atlas shards and the final join, package acceptance, same-run honesty and exact-head reproducibility passed, but the cancelled host job means this PR has not met full acceptance and cannot merge.

Fresh head63b9093/base4dc and the matching head/tested merge tree07a566 remain unchanged. The Intel job ran15:45:00–19:45:27 UTC against a240-minute workflow timeout; its terminal log says only “The operation was canceled.” That timing is consistent with the limit but does not establish the cause. The conformance run was incomplete; no failing-test result was observed. One focused terminal log and the full run/job receipt are preserved. No rerun, cancellation, source change or merge has been initiated; the source review remains scoped to the scheduling change.

afflom commented Nov 9, 2026

Copy link
Copy Markdown
Member Author

Release qualification is now consolidated in draft #450 at 25be1d8. It retains this PR's reviewed commit as a parent, carries the Atlas and BS-07 changes together with the Intel construction/partition fix, and targets release/v0.4. Keep this PR open and its history intact until the exact combined candidate passes full acceptance and is merged; do not launch another independent full gate here. #450 currently has source review and focused local tests only, with real Rust/Intel qualification still pending.

@afflom
afflom merged commit 25be1d8 into release/v0.4 Nov 10, 2026
56 of 58 checks passed

afflom commented Nov 10, 2026

Copy link
Copy Markdown
Member Author

The combined candidate #450 has now landed in release/v0.4 as cf76090 after all 50 exact full-gate jobs and exact-head reproducibility passed. Fresh readback confirms actual tree 0c24b969dcc5c02d9afb7616f97736827b7b09e6 equals the reviewed and fully tested tree. This preserves both source histories; GitHub now reports this original carrier merged. No separate rerun is needed. Acceptance: #450 (review)

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant