Repository navigation
Description
#483 landed as 465b8ab with the four P2 findings from final-head review 5872966303 still unresolved. This issue preserves that bounded repair scope after the six component carriers merged; the existing batch implementer retains ownership. Account authorship is not a takeover signal.
Actual tree bd8e6423d8b58e1163a64f5617dd08fe88ff3daf equals reviewed f3b25f2. PR CI 43198040363 passed 70/70 jobs and 772/772 steps, including same-run honesty; repro 43198040382 passed. Those results are complete evidence for that tree, but do not resolve the source findings.
- Account for concurrent caller evaluators in the process-wide budget in bootstrap.rs (reviewed lines 1035–1094), or explicitly narrow the contract to helper threads and assess the changed behavior. N−1 shared helpers plus C uncounted callers permit C+N−1 evaluators (N=4, C=2 permits 5).
- Reject overlapping writer paths using the regeneration .files manifests before applying patches in regenerate.yml (reviewed lines 123–132). Successful git apply does not establish disjoint writers: the existing demonstration shows two separated hunks in the same file both apply. Preserve binary-patch support and reuse that evidence.
- Restore the shared environment guard around transferred-export identity/git/tool-version/replay work in export_custody.rs (reviewed lines 381–393). The transferred take path bypasses the guarded production_export path. Place the guard after waiting and environment-independent digest work; avoid holding it across the long wait or recursive fallback. This is a source-reachable interaction with exclusive PATH-sentinel tests, not an observed CI race.
- Record the already-performed freshness plants, commands, observed refusals, restoration and scope in VERIFICATION.md. Reuse the existing owner evidence; no new plant or unrelated RP-14 runtime is requested.
Next owner checkpoint: identify the repair head or concrete blocker for these four items. Keep the changes bounded; coordinate any combined repair with the existing #405 forward lane. Reuse valid receipts and demonstrations, then qualify the final resulting head under the normal acceptance contract. No repeat of the completed #483 gate, competing implementation, blanket product regeneration or weakened check is requested. Close this issue with the actual merged repair PR and final-head/merged-tree evidence. Broad release and feature parents remain open.
Activity