Skip to content

Milestones

List view

  • Every scripts/bootstrap.sh change from the adopter field report, batched so ONE scratch-repo E2E validates all of them: repo settings (W3), security phase (W4), licence phase (W1), coarse-Type fallback (W5b), runner variable (W2). Exit criterion: zero open priority:p0/p1 issues, and the full E2E matrix in the plan run green.

    No due date
    10/10 issues closed
  • Adopter field-report items that need no scratch-repo E2E: the issue-labeler type:* strip bug, the async template-copy docs, the L4 licence/SBOM recipe, and the README Status refresh. Exit criterion: zero open priority:p0/p1 issues on this milestone, and no change to scripts/bootstrap.sh.

    No due date
    8/8 issues closed