3 changes: 0 additions & 3 deletions inputs/costs_PyPSA.csv
Original file line number Diff line number Diff line change
Expand Up @@ -183,9 +183,6 @@ central solar thermal,2030,lifetime,20,years,HP
electricity distribution grid,2030,investment,500,EUR/kW,TODO
electricity distribution grid,2030,lifetime,40,years,TODO
electricity distribution grid,2030,FOM,2,%/year,TODO
electricity grid connection,2030,investment,140,EUR/kW,DEA
electricity grid connection,2030,lifetime,40,years,TODO
electricity grid connection,2030,FOM,2,%/year,TODO
decentral oil boiler,2030,investment,156.0140915953699,EUR/kWth,Palzer thesis (https://energiesysteme-zukunft.de/fileadmin/user_upload/Publikationen/PDFs/ESYS_Materialien_Optimierungsmodell_REMod-D.pdf) (+eigene Berechnung)
decentral oil boiler,2030,lifetime,20.0,years,Palzer thesis (https://energiesysteme-zukunft.de/fileadmin/user_upload/Publikationen/PDFs/ESYS_Materialien_Optimierungsmodell_REMod-D.pdf)
decentral oil boiler,2030,FOM,2.0,%/year,Palzer thesis (https://energiesysteme-zukunft.de/fileadmin/user_upload/Publikationen/PDFs/ESYS_Materialien_Optimierungsmodell_REMod-D.pdf)
Expand Down
3 changes: 3 additions & 0 deletions inputs/manual_input.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,year,value,unit,currency_year,source,further_description
electricity grid connection,investment,2025,150,EUR/kW,2020,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion"
electricity grid connection,lifetime,2025,40,years,2020,same as 'electricity distribution grid',
electricity grid connection,FOM,2025,2,%/year,2020,same as 'electricity distribution grid',
methanation,investment,2020,748,EUR/kW_CH4,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), table 6: “Reference scenario”.",
methanation,lifetime,2020,20,years,2017,Guesstimate.,"Based on lifetime for methanolisation, Fischer-Tropsch plants."
methanation,FOM,2020,3,%/year,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), section 6.2.3.1",
Expand Down
6 changes: 3 additions & 3 deletions outputs/US/costs_2020.csv
Original file line number Diff line number Diff line change
Expand Up @@ -3946,9 +3946,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
electrobiofuels,C in fuel,0.9245,per unit,Stoichiometric calculation,,,,
electrobiofuels,FOM,2.4,%/year,combination of BtL and electrofuels,,2015.0,,
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Expand Down
6 changes: 3 additions & 3 deletions outputs/US/costs_2025.csv
Original file line number Diff line number Diff line change
Expand Up @@ -4032,9 +4032,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
electrobiofuels,C in fuel,0.9257,per unit,Stoichiometric calculation,,,,
electrobiofuels,FOM,2.5263,%/year,combination of BtL and electrofuels,,2015.0,,
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Expand Down
6 changes: 3 additions & 3 deletions outputs/US/costs_2030.csv
Original file line number Diff line number Diff line change
Expand Up @@ -4188,9 +4188,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
electrobiofuels,C in fuel,0.9269,per unit,Stoichiometric calculation,,,,
electrobiofuels,FOM,2.6667,%/year,combination of BtL and electrofuels,,2015.0,,
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Expand Down
6 changes: 3 additions & 3 deletions outputs/US/costs_2035.csv
Original file line number Diff line number Diff line change
Expand Up @@ -4212,9 +4212,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
electrobiofuels,C in fuel,0.9281,per unit,Stoichiometric calculation,,,,
electrobiofuels,FOM,2.7484,%/year,combination of BtL and electrofuels,,2015.0,,
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Expand Down
6 changes: 3 additions & 3 deletions outputs/US/costs_2040.csv
Original file line number Diff line number Diff line change
Expand Up @@ -4212,9 +4212,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
electrobiofuels,C in fuel,0.9292,per unit,Stoichiometric calculation,,,,
electrobiofuels,FOM,2.8364,%/year,combination of BtL and electrofuels,,2015.0,,
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Expand Down
6 changes: 3 additions & 3 deletions outputs/US/costs_2045.csv
Original file line number Diff line number Diff line change
Expand Up @@ -4212,9 +4212,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
electrobiofuels,C in fuel,0.9304,per unit,Stoichiometric calculation,,,,
electrobiofuels,FOM,2.9164,%/year,combination of BtL and electrofuels,,2015.0,,
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Expand Down
6 changes: 3 additions & 3 deletions outputs/US/costs_2050.csv
Original file line number Diff line number Diff line change
Expand Up @@ -4212,9 +4212,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
electrobiofuels,C in fuel,0.9316,per unit,Stoichiometric calculation,,,,
electrobiofuels,FOM,3.0,%/year,combination of BtL and electrofuels,,2015.0,,
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Expand Down
6 changes: 3 additions & 3 deletions outputs/costs_2020.csv
Original file line number Diff line number Diff line change
Expand Up @@ -975,9 +975,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0
electrobiofuels,C in fuel,0.9245,per unit,Stoichiometric calculation,,
electrobiofuels,FOM,2.4,%/year,combination of BtL and electrofuels,,2015.0
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,
Expand Down
6 changes: 3 additions & 3 deletions outputs/costs_2025.csv
Original file line number Diff line number Diff line change
Expand Up @@ -975,9 +975,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0
electrobiofuels,C in fuel,0.9257,per unit,Stoichiometric calculation,,
electrobiofuels,FOM,2.5263,%/year,combination of BtL and electrofuels,,2015.0
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,
Expand Down
6 changes: 3 additions & 3 deletions outputs/costs_2030.csv
Original file line number Diff line number Diff line change
Expand Up @@ -975,9 +975,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0
electrobiofuels,C in fuel,0.9269,per unit,Stoichiometric calculation,,
electrobiofuels,FOM,2.6667,%/year,combination of BtL and electrofuels,,2015.0
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,
Expand Down
6 changes: 3 additions & 3 deletions outputs/costs_2035.csv
Original file line number Diff line number Diff line change
Expand Up @@ -975,9 +975,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0
electrobiofuels,C in fuel,0.9281,per unit,Stoichiometric calculation,,
electrobiofuels,FOM,2.7484,%/year,combination of BtL and electrofuels,,2015.0
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,