docs(index): link Master Index to PR #25 + per-item frontend trackers#26
docs(index): link Master Index to PR #25 + per-item frontend trackers#26Adiz4415 wants to merge 5 commits into
Conversation
…catalog - Restructure PROJECT/issues/CONTRACTS_ISSUES.md into a single source of truth using canonical severity/area/evidence/impact/fix/acceptance format. - Cover all 60 catalog entries from issues/contracts.md (Critical 6, High 21, Medium 24, Low 9) with stable C-### IDs. - Preserve the legacy 34-item list as Section 7 cross-reference. - Add Summary Table, Severity Counts, Resolution Tracker, Top Remediations (ship-safety order), Cross-Reference Map, and Maintenance notes. - Provide anchor points for future PR references. Closes Pi-Defi-world#12
- Catalog sources & deduping section renames the prior Deduping section and explicitly elevates PROJECT/issues/CONTRACTS_ISSUES.md (PR Pi-Defi-world#22) and PROJECT/issues/BACKEND_ISSUES.md (PR Pi-Defi-world#23) to durable long-form references; FRONTEND_ISSUES.md remains legacy pending follow-up PR. - Top 20 list gains per-item deep links to the Resolution Tracker (Section 8) of each consolidated catalog and uniformly bolds IDs. - New CHANGELOG section appended in strict reverse-chronological order (this PR refresh first, then PR Pi-Defi-world#23 backend, then PR Pi-Defi-world#22 contracts, then future frontend consolidation).
…d 11 per-item tracker pointers - Catalog sources & deduping elevates PROJECT/issues/FRONTEND_ISSUES.md to durable long-form reference (was legacy/\u2018pending follow-up\u2019), cited to PR Pi-Defi-world#25. - Top 20 list gains per-item tracker pointers for the 11 user-listed frontend items: F-001/F-002/F-005 (Critical, wallet+auth) and F-014/F-015/F-019/F-020/F-022/F-025/F-051/F-063 (top-High ship-safety), mirroring the contracts/backend pointer pattern. - CHANGELOG now in reverse-chronological order with Frontend PR Pi-Defi-world#25 at top; Master Index Refresh entry cites PR Pi-Defi-world#25 directly; legacy\n \u2018_(Future) Frontend_\u2019 placeholder retired. - F-004 (item 20) remains Critical in Top 20 without a per-item pointer\n by design \u2014 not in user\u2019s explicit 11-set; CHANGELOG documents this so\n it is addressable in a follow-up PR.
|
Warning Review limit reached
More reviews will be available in 21 minutes and 30 seconds. Learn how PR review limits work. Your organization has used up its prepaid credits, and credit purchases are no longer available. Enable the review add-on in the billing tab to keep reviews running — you're only billed for reviews past your plan's rate limits ($0.25/file). ⌛ How to resolve this issue?After more reviews become available, a review can be triggered using the To avoid repeated limits, reduce automatic review volume by pausing incremental auto-reviews earlier, using label-based review opt-in, excluding WIP or generated PR titles, or requesting reviews manually when the PR is ready. If your team needs uninterrupted high-volume reviews, an organization admin can enable usage-based credits. 🚦 How do rate limits work?CodeRabbit enforces per-developer PR review limits for each organization. Most developers receive the normal plan refill rate. For paid Pro and Pro+ PR reviews, CodeRabbit uses adaptive limits for sustained high-volume activity. When a developer's recent PR review activity reaches the 95th percentile or higher among CodeRabbit users, the refill rate gradually slows as usage increases. The highest same-day bursts are limited more strictly. Please see our Fair Usage Limits Policy for further information. ℹ️ Review info⚙️ Run configurationConfiguration used: defaults Review profile: CHILL Plan: Pro Run ID: 📒 Files selected for processing (4)
✨ Finishing Touches🧪 Generate unit tests (beta)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
Summary
Follow-up to PR #24 (MASTER_INDEX refresh). This PR is the second-stage refresh linking the formerly-placeholder frontend catalog to the actually-merged PR #25 and adding per-item Top-20 tracker pointers for the 11 frontend items the user explicitly listed (mirror of the contracts/backend pointer pattern from PR #22 and PR #23).
What changed
## Catalog sources & deduping—PROJECT/issues/FRONTEND_ISSUES.mdis now listed alongsideCONTRACTS_ISSUES.mdandBACKEND_ISSUES.mdunder durable long-form references (no longer legacy), with PR docs(frontend): consolidate FRONTEND_ISSUES.md catalog #25 cited.## Top 20 (ship-safety order)— per-item tracker pointers added for the 11 user-listed frontend items, each linking to[tracker](../PROJECT/issues/FRONTEND_ISSUES.md#resolution-tracker-fix-status):#resolution-tracker-fix-statusslug (no#8-prefix).## CHANGELOG— strict reverse-chronological order maintained. New top entry: 2026-06 — Frontend catalog consolidation (PR docs(frontend): consolidate FRONTEND_ISSUES.md catalog #25). The Master Index Refresh entry from PR docs(index): add CHANGELOG + per-item Top-20 tracker pointers #24 is preserved but updated to cite PR docs(frontend): consolidate FRONTEND_ISSUES.md catalog #25 directly instead of referencing a placeholder. The legacy "(Future) Frontend" bullet is removed (now realized as PR docs(frontend): consolidate FRONTEND_ISSUES.md catalog #25).Honesty note
Item 20 (F-004 — wallet secret base64 obfuscation) remains Critical in Top 20 but without a per-item tracker pointer. The user's explicit 11-pointer list did not include F-004; the CHANGELOG entry explicitly documents this so reviewers can see the rationale. Adding/dropping F-004 can be addressed in a separate follow-up PR if desired.
Verification
…/FRONTEND_ISSUES.md#resolution-tracker-fix-statuslink.#8-resolution-tracker-fix-statusanchors anywhere (only#resolution-tracker-fix-status).Follow-ups
ISSUES.mdfiles now that all three catalogs are consolidated.