Skip to content

[WIP] front: use geom projection for constraints display - #18779

Draft
neigeantre wants to merge 2 commits into
abo/core-editoast/topologic-to-geometric-projectionfrom
abo/front/use-geom-projection
Draft

neigeantre wants to merge 2 commits into
abo/core-editoast/topologic-to-geometric-projectionfrom
abo/front/use-geom-projection

Conversation

@neigeantre

Copy link
Copy Markdown
Contributor

fix #9110

@neigeantre neigeantre self-assigned this Sep 25, 2026
@github-actions

Copy link
Copy Markdown
Contributor

⚠️ API changes

This Pull Request introduces some changes in the API:

  • please own it: notify or even prepare dedicated PR(s) to consumer projects

@github-actions github-actions Bot added area:core Work on Core Service area:front Work on Standard OSRD Interface modules area:editoast Work on Editoast Service area:integration-tests Work on Integration test, by nature related to different services kind:api-change labels Sep 25, 2026
…or reversed)

Signed-off-by: Arthur Bougeard <covillesheer@gmail.com>
Signed-off-by: Arthur Bougeard <covillesheer@gmail.com>
@neigeantre
neigeantre force-pushed the abo/front/use-geom-projection branch from 740a0c1 to f9111e2 Compare September 25, 2026 12:22
@neigeantre
neigeantre changed the base branch from dev to abo/core-editoast/topologic-to-geometric-projection September 25, 2026 12:23
@neigeantre
neigeantre added this pull request to stack #18780 September 25, 2026 13:17

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

area:core Work on Core Service area:editoast Work on Editoast Service area:front Work on Standard OSRD Interface modules area:integration-tests Work on Integration test, by nature related to different services kind:api-change

Projects

None yet

Development

Successfully merging this pull request may close these issues.

core: incompatible constraint is displayed at the wrong place along the path

1 participant