Repository navigation
Phase 4: drilling suggestion - #4
Merged
Merged
Conversation
- Slotted pipe is held to the depth limit (the deepest borewell nearby) and dropped under 10 ft; when every borewell nearby stops above the sand, nothing is proposed and the panel says why. - When no borewell nearby records its depth, the panel says the depth is not checked against them. - A nearby borewell whose ground height is unknown has no pipe drawn, rather than one at the wrong height. - What was done nearby is shown even where no layers can be proposed. - The water level reads 'expected', and the depth says when it rests on a rough guess.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Phase 4 of the design: a drilling suggestion under the proposed layers for any picked spot.
What it shows
Two halves, always together, so the suggestion can be weighed against what was really done:
What was done nearby (the 5 nearest sites within 3 km; borewells at one site count once)
What the records suggest
With no recent water level within 1 km, or no water-bearing stretch to suggest, it says so and shows only what was done nearby. With nobody nearby, there is no suggestion. The panel says the driller decides.
The rule for how deep to drill is my assumption, still to be confirmed by DWO. The screen says so.
Checks