Repository navigation
Bump Buzz relay to 8013105 - #3
Open
EwanDawson wants to merge 1 commit into
Open
EwanDawson wants to merge 1 commit into
EwanDawson wants to merge 1 commit into
Conversation
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01TTeLJUozS9qc4yDruwyYWw Signed-off-by: Claude <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
This PR moves
hetzner/versions.lockfrom1a5c693(#2) to8013105(block/buzzmain, 2026-11-22). The relay image changes, andpostgres:17-alpinegets a patch-level rebuild under the same tag.Important
Deploy this only after #2 is deployed and running. Upstream calls a relay build that has block#8325 but not migrations 0089 to 0095 a required stop (
docs/trigger-retirement-deployment.md).1a5c693(#2) is such a stop build. We currently run9a6cb3f, which is older than block#8325. Going straight from there to this PR would drop the database triggers while a relay that still depends on them is running.So the order is:
main). I deploy it.Rollback from this build goes only as far as
1a5c693. That works because we run withBUZZ_AUTO_MIGRATE=false, which is what upstream requires for rollback.One manual step after deploying
Upstream asks every operator to run the one-off, idempotent cleanup SQL from block#8211 once all relays run the new build. It purges NIP-RS and mesh-status heads that can be left soft-deleted during the stop window. I'll ask before running it, since it writes to the production database.
Upstream changes (156 commits; relay-side highlights)
Upstream has no
crates/buzz-relay/CHANGELOG.md, so this list comes from the commit log.delivery_logandsubscriptionstables are no longer used (Stop using the unused delivery_log and subscriptions tables block/buzz#9746)channels list/get/searchoutput changed (feat(cli)!: consistent channels list/get/search output (type, visibility, labels, real created_at) block/buzz#9617, breaking for scripts).Migrations (0089 to 0105, 17 files)
lock_timeoutand is safe to retry if it times out.Config and compose
deploy/compose/compose.yml: the defaultBUZZ_IMAGEis nowghcr.io/block/buzz:0.3.0(fix(deploy): pin self-host installs to relay 0.3.0 block/buzz#9714). Our overlay always setsBUZZ_IMAGEfromversions.lock, so this has no effect..env.example: adds commented-out push-gateway Android settings only.No new env vars are needed. The only manual step is the block#8211 cleanup above.
Follow-up
bin/bumpshould refuse to skip an upstream required stop. I'll propose that separately.Testing
bin/bumpresolved every digest.1a5c693is confirmed as a valid stop build: it contains block#8325 (68785206) and has no migration 0089. This PR changes no code.Generated by Claude Code