docs: refresh protected-main documentation fitness - #766
Conversation
|
Warning Review limit reached
Next review available in: 11 minutes You've used all free OSS reviews for now. Wait for the free limit to reset to keep reviewing this public repository. How can I continue?After more reviews become available, a review can be triggered using the To avoid repeated limits, reduce automatic review volume by pausing incremental auto-reviews earlier, using label-based review opt-in, excluding WIP or generated PR titles, or requesting reviews manually when the PR is ready. If your team needs uninterrupted high-volume reviews, an organization admin can enable usage-based reviews. How do review limits work?CodeRabbit enforces per-developer PR review limits for each organization. Most developers receive the normal plan review availability. For paid Pro and Pro+ PR reviews, CodeRabbit uses adaptive limits for sustained high-volume activity. When a developer's recent PR review activity reaches the 95th percentile or higher among CodeRabbit users, additional reviews become available more gradually as earlier reviews age out of the rolling window. Please refer docs for additional details. Review details⚙️ Run configurationConfiguration used: Path: .coderabbit.yaml Review profile: CHILL Plan: Pro Plus Run ID: 📒 Files selected for processing (2)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
1a3f2bd to
dc5f70a
Compare
Why
Protected main advanced materially beyond the prior documentation-fitness matrix. The old matrix still described the canonical documentation baseline, multilevel contracts, factor retention, item-bank lifecycle and other integrated work as open-PR-only or planned, which violated the repository's protected-main-vs-active-PR maturity discipline.
What
Boundary
Documentation + documentation-contract regression only. No numerical formula, public runtime API, dependency, workflow authority, physical DB schema, release version, or provider/reviewer credential changes.
Current source head is documentation-only and remains Draft. Keep it Draft until exact-head documentation/full applicable CI and current-head review are green. Documentation completion is not product completion; active implementation lanes retain their own exact-head evidence and writer leases.