Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
4 changes: 4 additions & 0 deletions CHANGELOG.md
Original file line number Diff line number Diff line change
Expand Up @@ -4,7 +4,11 @@ All notable changes to OriginWeave are documented in this file. The format follo

## [Unreleased]

- Refreshed the product-gap queue to 126 open pull requests (54 ready, 72 draft) after #190, #188, #185, #192, #182, #184, #115, #181, #116, #117, #118, #183, #114, #127, #112, #109, #186, #110, #108, #111, #174, and #113 were merged into their immediate stacked prerequisites. PRs #147, #146, #145, #144, #143, #142, #141, #139, #136, #132, #129, and #128 moved to ready after exact-head checks and thread review; these are queue-consolidation results, not protected-main shipment.

### Added
- Corrected the 2026-08-26 product-gap snapshot with current #229 presentation-identity evidence, stacked-only #205 integration evidence, current base/head pairs, the 126-PR queue count, explicit root-versus-child merge ordering, and the active GitHub counted-approval gate.
- Refreshed the product and technical gap baseline onto the 2026-08-26 live inventory: 126 open pull requests (54 ready, 72 draft), protected-main promotion of #168/#194/#196/#216/#151, a verified maintenance-loop record (supersession closure of #153, conflict reconciliations on #37/#149/#152/#173/#175, issue #212 option-(b) authorization on #43, Strix vuln-0001 homoglyph remediation on #124), provider-rerun outcome evidence, an organization review-pipeline congestion record, and refreshed merge-order queue guidance. Documentation evidence contracts were aligned to the same snapshot so the baseline, its dated markers, and the pinned exact-head rows cannot silently diverge.

- Refreshed the product and technical gap baseline with the 2026-08-24 live inventory: 158 open pull requests (44 ready, 114 draft), refreshed exact base/head evidence for the #208–#222 release, enterprise-approval, BAP, and WARC/PROV chains, the governance issue additions #212 and #215, and a required-check provider-failure record for the fail-closed Strix re-dispatches on #208/#218/#220.
- Added a dated product and technical gap baseline that separates protected-main implementation truth, active pull-request evidence, live review/check blockers, and the next buyer-visible Phase 1 acceptance work.
Expand Down
Loading
Loading