Repository navigation
docs: release checklist asks for the newest base images - #793
Merged
Merged
Conversation
A release ships whatever base images the Dockerfile names, and the pinned distroless digest and Rust version never move by themselves. A new judgment box on the version-bump pull request has the agent bring them up to date before the smoke-install run, and the hook contract now asks the images step to fetch every base image fresh. Changelog: none, release process only Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013rPDLhkh1Xdj28Bu6KMVGV
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
v2.10.0 shipped on an old distroless runtime digest, so the image missed Debian's OpenSSL and zlib fixes. Nothing in the release asks anyone to move the pinned base images, so the version-bump pull request now carries a box for it, ahead of the smoke-install run that builds on them.
CHECKLIST_ITEMS ... An MCP conformance run is recorded, if MCP behavior changed. + The base images the release builds from are the newest. `just smoke-install` passed against an image built from the version-bump branch. The release title and notes are drafted.docs/maintenance/release-runbook.md: how to tick it (distroless digest, Rust in the Dockerfile andrust-toolchain.tomltogether, Node major), and a new hookimagesduty: fetch every base image fresh on each build.docs/adr/README.md: ADR-36 decision 3 amended with the new box.Evidence
node --test scripts/release-common.test.mjspassed with 8 boxes.After: 23/23 pass with 9 boxes, including a new test that the base-images box sits before the smoke-install box.
Merge Danger
Door: two-way
Blast Radius: releases
The next
release-preparerenders the new box, andrelease-publishrefuses until it is ticked. A version-bump pull request opened before this merges lacks the box, so publish would refuse it withrelease checklist; none is open now.🤖 Generated with Claude Code
https://claude.ai/code/session_013rPDLhkh1Xdj28Bu6KMVGV