Skip to content

Latest commit

 

History

6 Commits

Folders and files

NameName
Last commit message
Last commit date
 
 
 
 
 
 
 
 

Repository files navigation

last-90 — finish the last 90% of a web app launch

The first 10% is the working demo agents nail. The last 90% — authorization, monitoring, legal, backups, abuse limits, CI/CD, an ops runbook — is what separates a demo from something safe to put in front of real users. This skill does that work, on a loop, until your app is genuinely ship-safe.

A goal-driven Claude skill. Point it at a freshly deployed web app and it scores production-readiness, then does every fix it can on its own, only stopping to ask you for the things it can't get without you (an error-tracker DSN, GitHub Actions access, a backup bucket, a legal decision).

Open source first: monitoring recommendations default to self-hostable tools — Bugsink or GlitchTip for error tracking (both speak the Sentry SDK protocol, so hosted Sentry is a drop-in swap) and Uptime Kuma or Gatus for uptime. Nothing in the gate forces a paid SaaS.

It's the follow-on to a deploy: ship → /last-90 → confident it's set up properly.

What it checks — "the scale"

A Launch Gate of 10 binary blockers (target 10/10) on top of 11 graded dimensions. Every item is tagged 🤖 agent does it or 🙋 needs your account/decision.

Launch Gate (must all pass)
Core flows work against the prod build · Real auth (vetted lib) · Authorization / tenant isolation · Security hardening (validation, rate limits, no secrets in repo) · Legal pages · Error monitoring live in prod · UGC moderation (if applicable) · CI/CD on every PR · Health check endpoint · Backups with a rehearsed restore

Dimensions go deeper: MVP audit, security, failure modes, unit economics, scalability, observability, data protection, UX resilience, legal & risk, abuse prevention, ops playbook. Full criteria in skills/last-90/references/scale.md.

Stack-aware (works for VPS+SQLite+Litestream or Vercel+Supabase+Sentry), not locked.

How it runs

  1. Detects your stack from the repo.
  2. Scores a baseline and splits the gaps into an autonomous queue and a needs-you queue.
  3. Access & Connections Intake — one upfront question: which services can you grant now vs defer?
  4. Loops autonomously — implements and verifies every 🤖 item.
  5. Batches one check-in for the 🙋 items, with exact steps. Resumes when you grant access.
  6. Verdict: SHIP-SAFE / NOT-YET, with evidence.

Install

As a plugin (one command):

/plugin marketplace add Avanderheyde/webapp-last-90
/plugin install last-90@webapp-last-90

As a plain skill: copy plugins/last-90/skills/last-90/ into ~/.claude/skills/.

Use

From inside your deployed app's repo:

/last-90              # score + finish the last 90%
/last-90 explain      # same, but teaches you what each item is and why it matters

explain mode is for first-time vibe coders — it narrates what it's doing and why it matters (the concrete failure each fix prevents) as it goes.

License

MIT

About

The last 90% of shipping a web app — a goal-driven Claude skill that finishes production-readiness (authz, monitoring, legal, backups, rate limits, CI/CD, ops) after you deploy.

Topics

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors