Skip to content

About

No description, website, or topics provided.

Resources

Stars

0 stars

Watchers

0 watching

Forks

Repository files navigation

Preliminary documentation

Introduction

The problem that opti_market solves is to optimize the charge and discharge of a battery connected to 1 or 2 markets, such that the profit is the maximum possible, considering the degradation of the battery and other constraints that preserve the state of the battery, with the additional binary constraint to not have a battery that charges and discharges at the same time. The package that has been chosen to solve the optimization is PuLP, and the corresponding solver is HiGHS; both are free and easy to install with conda or pip. These packages are easy to use, and there is a wide variety of usage examples. Since the problem requires that the battery is not charging while discharging, it is necessary to use a package that is able to configure an optimization problem with both continuous and integer variables (i.e., charge or discharge), so HiGHS was the best choice. The optimization maximizes the profit as a function of a given interval of time (in days). So, if the user ran a simulation of one year, with a time interval of 1 day, the final results would be the results of 365 optimizations. The package reads the markets in .csv format, collects the information of the markets, and computes the minimal time resolution to use in the optimization routine. The package stores all the prices of the markets redundantly. The battery specification is read from an internal database. The internal database contains all the specifications of the batteries, and, using this information, the package constructs the battery that is dispatched for the given markets. The battery can degrade, and there are three models of degradation: linear (which assumes that the degradation always refers to the initial state), compound (which assumes that the degradation refers to the previous state) and none (which assumes no degradation model). The package requires a configuration file that contains the information of the simulation (where to find the markets, which battery to use, and where to save the data). This configuration file contains additional constraints for the optimization: the minimal energy that the dispatched battery should retain at the end of the simulation, the time frame to perform the optimization, and the window of optimization (i.e., the number of days of each optimization). The package releases the output of a given simulation as a series of .csv files. The package has not been designed yet to provide a graphical representation of the extracted data.

Warning

The package is designed to accept several models of degradation. However, the degradation introduces non-linearities. Since the package updates the battery state after each optimization window, the degradation models should be used with extra care regarding the window of optimization. For example, if the optimization is unconstrained, in principle the user can use the entire year as the optimization window. However, if the user wants to quantify the battery degradation, they should use a reasonable window. The basic deployment of the battery in this package always assumes a 1-day optimization window.

Note

The linear degradation formulation can be linearised and introduced natively within the linear optimization packaged. However, I preferred to have only one formulation and not introduce cases/subcases.

Note

  1. I am not accustomed to non-linearities, so the degradation of the battery is treated as a state updated every n days.
  2. Another simplifying assumption is that the user cannot start the simulation partway through a day, but always at 00:00 on the starting date.
  3. AI assistance: I used AI to ask about specific functionalities of PuLP, for code revision, and to provide examples of PuLP usage and a few functionalities concerning the pd.Dataframe (used as a flexible stackoverflow)

Package layout

opti_market
├── base_configuration
│   ├── blue_print.yml
│   ├── double_market_min_charge.yml 
│   ├── double_market_unconstrained.yml #
│   ├── double_market.yml
│   ├── single_market_a.yml
│   └── single_market_b.yml
├── opti_market_enviroment.yml
├── pyproject.toml
├── README.md
├── src
│   └── opti_market
│       ├── __init__.py
│       ├── __main__.py
│       ├── config_module
│       │   ├── __init__.py
│       │   ├── configuration_read.py
│       │   ├── configure_battery.py
│       │   ├── configure_market.py
│       │   ├── configure_output.py
│       │   └── configure_simulation.py
│       ├── data
│       │   └── battery_data_base.yaml
│       ├── opti_market.py
│       ├── optimisation_module
│       │   ├── __init__.py
│       │   └── optimization_routines.py
│       └── output_module
│           ├── __init__.py
│           └── write_csv_data.py
├── study_case
│   ├── convert_timeseries.py
│   ├── market_case.xlsx
│   ├── market1.csv
│   └── market2.csv
└── tests
    ├── __init__.py
    ├── configuration_folder_tests
    │   ├── double_market.yml
    │   ├── single_market_a.yml
    │   └── single_market_b.yml
    ├── test_config_battery.py
    ├── test_config_read_market.py
    ├── test_configuration.py
    └── test_optimization.py

Installation

To install the package:

conda env create -f opti_market_enviroment.yml

Then:

conda activate battery_optimization

To run the tests:

pytest

Note

The tests are basic, and they refer to a specific configuration folder within the tests folder. The tests were generated while developing the package; thus, they are not representative of the intended usage of the package. However, they can be used for generating scripts that use the functionalities of opti_market.

Basic usage

The package has been designed to always require a configuration file. The basic templates for the task are in /base_configuration:

  • blue_print.yml: a basic reference for the configuration file
  • single_market_a: optimisation only for the market whose prices are defined every 0.5 h
  • single_market_b: optimisation only for the market whose prices are defined every 1.0 h
  • double_market: optimisation for both markets of the handout.

The simplest usage is the following (in Linux/macOS):

export pack_package="$PWD"

python -m opti_market --config_file "${PWD}/base_configuration/double_market.yml"

After the optimisation, the results are stored in:

results/
  └── Double_Market/
        ├── Data_Raw/
        |    ├── market_n1.csv
        |    └── market_n2.csv
        ├── Data_Window/
        |    └── window_optimisation_results.csv
        └── summary.csv
  • Data_Raw: contains the results of each market, per period (e.g., market_n1.csv and market_n2.csv).
  • Data_Window: contains the results of each optimisation window (merged for all the markets) (e.g., window_optimisation_results.csv).
  • summary.csv: contains the summary data.

Data_Raw csv format:

Column Unit Definition
timestamp date and time Start of the market period. Each row covers one period of the market's own resolution (30 minutes for Market 1, 1 hour for Market 2).
price_gbp_per_mwh £/MWh Market price for that period, from the input data.
charge_mw MW Power bought from this market during the period, i.e. energy flowing from the grid into the battery. Constant over the whole period (commitment rule).
discharge_mw MW Power sold to this market during the period, i.e. energy flowing from the battery to the grid. Constant over the whole period.
revenue_gbp £ Net cash flow of the period: price × (discharge − charge) × period length in hours. Negative when the battery buys, positive when it sells.

Data_Window csv format:

Column Unit Definition
start date and time Start of the optimisation window (included), always at 00:00.
end date and time End of the window (excluded): start + window length.
total_revenue_gbp £ Profit of the window: the sum of the net revenues of all markets over the window.
energy_end_mwh MWh Energy stored in the battery at the end of the window. It becomes the starting energy of the next window.
discharged_mwh MWh Energy drawn from the battery during the window, including discharge losses: the sum of all decreases of the stored energy. It drives the cycle count and the degradation update.

Summary

Metric Unit Definition
start_date date First moment of the simulation (included), at 00:00.
end_date date End of the simulation (excluded): the last simulated window ends just before this moment. With end_date = 2019-01-02, the last simulated day is 2019-01-01.
optimization_window days Length of each optimisation window. Each window is solved separately, and the battery state is carried over to the next one.
battery_model – Name of the battery in the battery database (battery_data_base.yaml).
total_revenue GBP Total profit over the simulation: the sum of the net revenues of all markets and all windows.
final_energy_mwh MWh Energy stored in the battery at the end of the last window.
market_revenues:<market> GBP Net revenue of each market over the whole simulation. Negative when the battery mainly buys in that market. The market values add up to total_revenue.
battery_cyles cycles Equivalent full cycles at the end of the simulation, including any initial_cycles of the battery. One cycle = discharging the full storage capacity; partial discharges add up.
effective_max_pow_mw MWh Storage capacity at the end of the simulation, after degradation (initially max_storage_vol, 4 MWh for bt001).

Three template final results

The basic examples yield the following results:

Market 1 only Market 2 only Both markets Both markets, 25% minimum charge Both markets, no constraints, no degradation
Configuration file single_market_a.yml single_market_b.yml double_market.yml double_market_min_charge.yml double_market_unconstrained.yml
Period 2018-01-01 – 2019-01-07 2018-01-01 – 2019-01-07 2018-01-01 – 2019-01-07 2018-01-01 – 2019-01-07 2018-01-01 – 2019-01-07
Days simulated 372 372 372 372 372
Degradation model linear linear linear linear none
Maximum cycles per day 1.37 1.37 1.37 1.37 no limit
Minimum charge 0% 0% 0% 25% 0%
Total revenue £46,087.76 £53,076.35 £58,527.53 £50,240.62 £67,958.35
Revenue per day £123.89 £142.68 £157.33 £135.06 £182.68
Net revenue, Market 1 £46,087.76 – −£54,221.22 −£47,408.89 −£109,745.39
Net revenue, Market 2 – £53,076.35 £112,748.75 £97,649.50 £177,703.73
Battery cycles 491.59 493.36 508.24 504.72 950.37
Cycles per day 1.32 1.33 1.37 1.36 2.55
Capacity at the end 3.98 MWh 3.98 MWh 3.98 MWh 3.98 MWh 4.00 MWh
Energy at the end 0.00 MWh 0.00 MWh 0.00 MWh 0.99 MWh 0.00 MWh

Configuration file

Every simulation is defined by one YAML file. base_configuration/blue_print.yml is an empty template:

simulation:
  name: 'Random_name'
  optimization:
    window_days:
    start_date:
    end_date:
    max_cycles:
    charge_min:
  battery:
    model_name:
    degradation_model:
    initial_cycles:
    initial_age:
    initial_charge:
  markets:
    market1:
      prices_file:
      path_to_file:
      packaged_data:
    market2:
      prices_file:
      path_to_file:
      packaged_data:
  output:
    path_to_save:
    default_location:
    clean_option:

Fields marked as optional can be omitted: the default value is then used. A missing mandatory field stops the program with an error that names the field.

simulation

Key Required Default Description
name yes – Name of the simulation. It is also the name of the output folder (results/<name>).

optimization

Key Required Default Description
start_date yes – First day of the simulation (YYYY/MM/DD or YYYY-MM-DD). The simulation always starts at 00:00.
end_date no start_date + 1 day End of the simulation, excluded. With end_date: 2019/01/08, the last simulated day is 2019-01-07.
window_days no 1 Length of each optimisation window in days. The number of days between start_date and end_date must be a multiple of window_days.
max_cycles no 1e9 (no limit) Maximum equivalent full cycles per optimisation window: the energy drawn from the battery in a window cannot exceed max_cycles × current capacity. The base configurations use 1.37 = 5000 cycles / 10 years / 365 days.
charge_min no 0.0 Minimum energy kept in the battery, as a fraction (0–1) of the current capacity. It must not be larger than initial_charge, otherwise the first window has no solution.

battery

Key Required Default Description
model_name yes – Name of the battery in src/opti_market/data/battery_data_base.yaml. The database contains only the battery of the task (bt001).
degradation_model no linear linear, compound and none. After each window, the storage capacity is updated from the number of cycles n and the degradation per cycle a: linear $E_{\max}(n) = E_{\max}^{0}(1 - a,n)$, compound $E_{\max}(n) = E_{\max}^{0}(1 - a)^{n}$. None, instead is not applying any degradation model
initial_cycles no 0 Equivalent full cycles already done by the battery before the simulation. The initial capacity is degraded accordingly.
initial_age no 0 Age of the battery in years. Stored, but not used in the current version.
initial_charge no 0.5 Energy in the battery at the start of the simulation, as a fraction (0–1) of the capacity.

markets

One block per market (market1, market2, …; at most 6). The names are free; the markets are numbered market_n1, market_n2, … in the order they appear, and these numbers are used in the output files.

Key Required Default Description
prices_file yes – Name of the CSV file with the prices. Columns: timestamp, price_gbp_per_mwh. The time step must be 15, 30, 45 or 60 minutes and constant.
packaged_data no True If True, the file is read from the study_case folder of the repository.
path_to_file no null Folder containing prices_file. Use it with packaged_data: False. Setting both a path and packaged_data: True is an error.

output

Key Required Default Description
default_location no True If True, the results are saved in <repository>/results/<name>.
path_to_save no null Folder where the results are saved (<path_to_save>/results/<name>). Use it with default_location: False.
clean_option no True If the output folder already exists, True deletes it and writes the new results; False stops the program.

Example

The configuration of the double-market case (base_configuration/double_market.yml):

simulation:
  name: Double_Market
  optimization:
    window_days: 1
    start_date: 2018/01/01
    end_date: 2019/01/08
    max_cycles: 1.37
    charge_min: 0.0
  battery:
    model_name: bt001
    degradation_model: linear
    initial_cycles: 0
    initial_age: 0
    initial_charge: 0.5
  markets:
    market1:
      prices_file: market1.csv
      path_to_file: null
      packaged_data: True
    market2:
      prices_file: market2.csv
      path_to_file: null
      packaged_data: True
  output:
    path_to_save: null
    default_location: True
    clean_option: True

Note

I removed the basic plot option. I believe that the graphical representation of the output should be outside the optimisation package.

About

No description, website, or topics provided.

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages