Skip to content

How to control for time, both in estimation and simulation #123

@ANBurdett

Description

@ANBurdett
  1. Estimate relevant processes with time dummies
  2. Inspect the time dummies coefficients
  3. Update specification: e.g. linear, quadratic, with/without structural breaks (selection of time dummies)
  4. Run and validate the model with the parametric specification
  5. If validation is passed, use parametric specification for projections
  6. If validation is not passed, use time dummies (PCM) to rule out implementation errors, and go back to Changes required to unify the EU models #1.

Note:

  • If time dummies are not significant, remove time trends

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions