1) Estimate relevant processes with time dummies 2) Inspect the time dummies coefficients 3) Update specification: e.g. linear, quadratic, with/without structural breaks (selection of time dummies) 4) Run and validate the model with the parametric specification 5) If validation is passed, use parametric specification for projections 6) If validation is not passed, use time dummies (PCM) to rule out implementation errors, and go back to #1. Note: * If time dummies are not significant, remove time trends