Skip to content

[Bridge Advisor] Advisor outreach and engagement tracker #9

@salpida-foundation

Description

@salpida-foundation

Purpose

Track the outreach and engagement process for a short-term Bridge Advisor supporting External Layer-0 technical review.

This issue exists to move from:

Bridge Advisor candidate longlist
→ first-contact shortlist
→ intro call
→ conflict / fit review
→ advisory engagement decision
→ Bridge Advisor review of #8 

This issue is for advisor engagement tracking only.

This issue does not create Sal-Meter validation.

This issue does not create CAIS compliance.

This issue does not create certification.

This issue does not create device readiness.

This issue does not create production readiness.

This issue does not authorize public claims.


Relation to current execution route

This issue follows:

#7 remains the public candidate lab outreach tracker.

#8 remains the technical shortlist review issue.

This issue exists to identify and engage a Bridge Advisor who can review #8 before any candidate lab outreach, meeting request, SOW discussion, or paid feasibility work.


Role basis

Bridge Advisor expected role:

  • review Sal-Meter Layer-0 RFP / SOW logic;
  • recommend suitable external electrochemical or biosensor laboratories;
  • help define first meeting questions;
  • support candidate lab technical review;
  • later review raw traces / protocol logs / QC summaries if work proceeds;
  • provide Go / Revise / No-Go technical memo support.

The advisor does not define CAIS.

The advisor does not validate Sal-Meter.

The advisor does not certify any system.

The advisor does not speak publicly on behalf of SICS unless separately authorized in writing.


Public information boundary

Public GitHub may include:

  • anonymized advisor candidate IDs;
  • public professional profile links if appropriate;
  • high-level fit category;
  • non-sensitive contact status;
  • non-sensitive next action.

Public GitHub must not include:

  • private emails;
  • private phone numbers;
  • compensation terms;
  • confidential evaluations;
  • private quotes;
  • legal terms;
  • NDA drafts;
  • internal criticism;
  • conflict details;
  • sensitive technical discussion;
  • sensitive IP discussion.

Private details must remain in the controlled-access data room.


Advisor candidate tracker

Candidate ID Public profile / source Fit area Contact status Fit rating Conflict risk Next action
BA-C01 TBD TBD Not contacted Unknown Unknown Identify candidate
BA-C02 TBD TBD Not contacted Unknown Unknown Identify candidate
BA-C03 TBD TBD Not contacted Unknown Unknown Identify candidate
BA-C04 TBD TBD Not contacted Unknown Unknown Identify candidate
BA-C05 TBD TBD Not contacted Unknown Unknown Identify candidate

Contact status options:

Not contacted
Shortlisted
Email drafted
Email sent
Response received
Intro call requested
Intro call scheduled
Intro call completed
Candidate selected
Hold
Rejected

Fit rating options:

High
Medium
Low
Unknown

Conflict risk options:

Low
Medium
High
Unknown

First-contact boundary

The first advisor outreach message should state:

  • SICS is seeking a short-term technical advisor;
  • the role is 30–60 day technical advisory support;
  • the focus is External Layer-0 electrochemical feasibility;
  • the role is not a public spokesperson role;
  • the role does not create CAIS authority;
  • the role does not validate Sal-Meter;
  • the role does not certify any system;
  • confidential details will be handled outside public GitHub.

The first message must not state or imply:

  • advisor endorsement;
  • Sal-Meter validation;
  • CAIS compliance;
  • certification;
  • device readiness;
  • production readiness;
  • public competition opening;
  • public spokesperson status;
  • official authority over SICS terminology.

Advisor fit criteria

A suitable Bridge Advisor should have credible experience in one or more of the following:

  • electrochemical biosensor development;
  • gold electrode systems;
  • aptamer-electrode interface;
  • SELEX familiarity;
  • redox chemistry;
  • thiol / glutathione sensing;
  • university or industry research collaboration;
  • raw electrochemical trace interpretation;
  • protocol / QC / drift review;
  • Go / Revise / No-Go technical memo writing.

Expected advisor outputs

The selected advisor should be able to provide:

  1. short comments on the Layer-0 RFP / overview;
  2. review of founder-seeded candidate lab longlist;
  3. recommended first 3 outreach targets;
  4. first-call technical question list;
  5. candidate-specific caution notes;
  6. recommendation on university-lab vs national-research-institute vs CRO route;
  7. recommendation on whether two-lab parallel feasibility is justified;
  8. later review of raw traces / protocol logs / QC summaries if work proceeds;
  9. short Go / Revise / No-Go technical memo.

Relation to #8

#8 should not be treated as completed until a qualified Bridge Advisor or equivalent technical reviewer has reviewed the candidate shortlist or a documented reason is given why internal review is temporarily sufficient.

This issue supports #8.

This issue does not replace #8.

This issue does not authorize candidate lab outreach by itself.


Relation to PM / counsel review

Bridge Advisor engagement does not authorize outreach or paid work by itself.

After advisor review, PM / counsel review is still required before:

  • formal lab outreach;
  • SOW discussion;
  • paid feasibility work;
  • public characterization;
  • partner announcement;
  • data exchange;
  • contract signature.

Completion condition

This issue is complete when:

  • at least 5 Bridge Advisor candidates are identified or marked for private review;
  • at least 3 candidates are suitable for first contact, or a reason is given why fewer qualify;
  • first-contact message boundary is confirmed;
  • no private advisor data is exposed publicly;
  • no compensation or legal terms are exposed publicly;
  • one advisor candidate is selected, rejected, or placed on hold;
  • selected advisor, if any, is ready to review [Bridge Advisor] Layer-0 candidate shortlist technical review #8;
  • PM / counsel review requirement is retained;
  • no validation, certification, CAIS compliance, Sal-Meter status, device readiness, production readiness, or public claim authority is introduced.

Final boundary

This issue is an advisor outreach and engagement tracker only.

It is not validation.

It is not certification.

It is not Sal-Meter.

It is not CAIS compliance.

It is not device readiness.

It is not production readiness.

It is not production authority.

It does not authorize public claims.

It does not authorize candidate lab outreach by itself.

It does not approve paid laboratory work.

The repository remains a public technical helper and implementation index.

Canonical authority remains fixed in DOI / OSF records and the Salpida Foundation public routing structure.

Metadata

Metadata

Labels

layer-0status-firstRead Status first before PI, lab, or technical participation

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions