Skip to content

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.2 #898

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.2

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.2 #898

Triggered via pull request March 21, 2025 14:42
Status Failure
Total duration 34m 46s
Artifacts

build.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.10)
Process completed with exit code 1.
build (3.11)
The job was canceled because "_3_10" failed.
build (3.11)
Process completed with exit code 1.
build (3.13)
The job was canceled because "_3_10" failed.
build (3.13)
The operation was canceled.
build (3.12)
The job was canceled because "_3_10" failed.
build (3.12)
The operation was canceled.
build (3.9)
The job was canceled because "_3_10" failed.
build (3.9)
The operation was canceled.