chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.10.0 #882
build.yml
on: pull_request
lint
30s
sast
1m 9s
Matrix: build
Annotations
9 errors
|
build (3.13)
Process completed with exit code 1.
|
|
build (3.9)
The job was canceled because "_3_13" failed.
|
|
build (3.9)
Process completed with exit code 1.
|
|
build (3.11)
The job was canceled because "_3_13" failed.
|
|
build (3.11)
The operation was canceled.
|
|
build (3.12)
The job was canceled because "_3_13" failed.
|
|
build (3.12)
The operation was canceled.
|
|
build (3.10)
The job was canceled because "_3_13" failed.
|
|
build (3.10)
The operation was canceled.
|