Skip to content

Define Draft Time Module Roadmap to S-CORE v1.0 #99

Description

@lavrovvalera

What

Define and agree on the initial Time module roadmap that maps out the delivery path
from v0.8 to S-CORE v1.0 — capturing feature scope, artefact maturity targets (L0–L4)
per process area, and the per-component breakdown across all four SW components.

Background

The S-CORE project requires all modules to align on maturity level targets at each release
gate (v0.8, v0.9, v0.10, v1.0). The Time module enters v0.8 with a focused scope
(reference_integration CI only, #68); process artefact catch-up is planned for v0.9.
A documented plan ensures the team has a shared understanding of what is expected at each
gate and where the known gaps and risks are.

Deliverable

docs/release/roadmap.rst in the module repository, covering:

  • Feature scope table (in-scope / deferred)
  • Roadmap Overview: artefact × milestone with L0–L4 maturity targets
  • Detailed Breakdown: per-component tables for PA2–PA6
  • Summary gate compliance table (project requirement vs. Time module delivery)
  • Epics & tracking links to GitHub board

Reference: https://eclipse-score.github.io/process_description/main/process_areas/documentation_management/

Acceptance Criteria

  • Feature scope is explicit: in-scope (SteadyTime, SystemTime, VehicleTime, HighResSteadyTime) and deferred (AbsoluteTime)
  • L0–L4 maturity targets are agreed for each process artefact at each milestone (v0.8–v1.0)
  • score/time_slave one-milestone lag is documented
  • SCA/coverage baseline confirmed from current CI (≥ 85% C0)
  • docs/release/roadmap.rst merged to main
  • Reviewed and agreed by Time FT team

Metadata

Metadata

Assignees

Labels

No labels
No labels

Type

Fields

No fields configured for Task.

Projects

Status
In Progress

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions