Skip to content

Latest commit

 

History

History
15 lines (9 loc) · 784 Bytes

File metadata and controls

15 lines (9 loc) · 784 Bytes

Construction Hub — Phase Gate 3

Bilingual Navigation: English (this document) · Versión en Español Up: Repository Portal

Goal and Objectives

Goal: ensure every line of code written during construction is traceable to an approved contract, with zero tolerance for Architecture Drift (BR-004).

Objectives:

  • Define the Construction domain model (ImplementationCycle, TechnicalStory, PeerReview).
  • Track spec-to-code traceability and real-time drift detection.

This hub is empty. Phase 3 has not started. Per the Evolith SDLC standard, this phase will produce Technical Stories and DoD evidence; its documents will be indexed here as they are worked.