Skip to content

Base Year not reported if it is one of the Years run in a future scenario #203

Description

@jrawbits

VisionEval 3.x has a couple of places where it is presumed that the BaseYear is a stage unto itself. Some older models are most easily set up to make the BaseYear just one of the years within a particular scenario. The main problem with such a setup is that the BaseYear is not exported because VisionEval doesn't want to make multiple copies of it in each scenario.

To avoid the problem in the first place, make the BaseYear its own stage and use the "StartFrom: BaseYearStage" instruction for each future stage or scenario in visioneval.cnf.

To save people from themselves (at the expense of possibly running and reporting multiple copies of the base year if peopl ehave included it to run in multiple stages), obtaining results should include the BaseYear if it is present in Datastore at the top of DatastorePath, but not if the BaseYear is further down the DatastorePath.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Fields

    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions