Skip to content

Latest commit

 

History

History
52 lines (38 loc) · 1.5 KB

ROADMAP.md

File metadata and controls

52 lines (38 loc) · 1.5 KB

Project Zero Roadmap

This is a public launch roadmap, not a promise of dates.

Now — Coming

  • Public Project Zero GitHub home
  • Platform and Console launch readiness
  • Project Zero end-to-end certification
  • OpenCode integration certification
  • Tessen CLI public-release certification
  • Tessen Node public-release certification
  • independent Tessen Status
  • developer identity and auth closure
  • usage, cost, reliability and abuse telemetry

Zero Pool launch contract

  • Starting baseline: 100T shared tokens/day
  • Reset: 00:00 UTC
  • Growth: verified opted-in Tessen Node capacity can increase the next day's published pool
  • Measurement: displayed capacity comes from production authority, never a marketing multiplier

Opening gate

The Zero Pool opens when a clean developer can:

  1. discover Project Zero;
  2. authenticate through a supported public method;
  3. enter the developer Console;
  4. follow real setup instructions;
  5. make a successful Project Zero coding request;
  6. return later successfully;
  7. see honest service status and documentation.

After opening

Priorities become evidence-driven:

  • activation;
  • Day-1 / Day-7 / Day-30 retention;
  • request success and latency;
  • developer feedback;
  • Node adoption and reliability;
  • sustainable capacity and cost;
  • developer-tool integrations.

Later

Additional editor, desktop, mobile and developer integrations can follow after the core Zero loop is reliable.

No roadmap item in this document should be interpreted as a guaranteed ship date.