Skip to content

Latest commit

 

History

History
75 lines (50 loc) · 2.7 KB

File metadata and controls

75 lines (50 loc) · 2.7 KB

Summary

Linked issue

Closes #

Scope

  • Issue or RFC this advances:
  • Why this is in scope (not a "quick useful surface" or breadth addition):
  • Accepted evidence it is real (test/usage/repo state, not intent):

What changed

Acceptance criteria completed

Testing performed


Screenshots

Security and data considerations

Dependencies and blocked work

Scope changes or remaining work

Contributor checklist

  • This PR targets dev
  • I claimed the issue and had it assigned or acknowledged before starting substantial work
  • The branch was created from an up-to-date upstream/dev
  • The branch is rebased on the latest upstream/dev
  • This PR addresses one clearly scoped issue
  • This PR is in scope: it advances a tracked issue or an accepted RFC (Scope section filled)
  • Every acceptance criterion I claim as complete is actually complete
  • Relevant tests pass
  • Documentation is updated for any user-visible change
  • No secrets, credentials, local env files, or generated artifacts are included
  • No unrelated files were changed
  • Closing syntax (Closes) is used only because the issue is fully resolved
  • Dependencies and follow-up work are linked