diff --git a/MVP_IMPLEMENTATION_PLAN.md b/MVP_IMPLEMENTATION_PLAN.md new file mode 100644 index 0000000..004ed91 --- /dev/null +++ b/MVP_IMPLEMENTATION_PLAN.md @@ -0,0 +1,915 @@ +# LARUN.SPACE - Hobbyist MVP Implementation Plan +## Priority 1: Minimum Viable Product for Market Launch + +**Document:** MVP-LARUN-2026-001 +**Target Launch:** 6-8 weeks from start +**Tier:** Hobbyist ($9/month, $89/year) +**Goal:** 50-100 paying users in first 90 days + +--- + +## EXECUTIVE SUMMARY + +This document defines the ABSOLUTE MINIMUM requirements to launch LARUN.SPACE Hobbyist tier. Everything not listed here is OUT OF SCOPE for MVP and deferred to Phase 2+. + +### What Hobbyist MVP IS: +- Basic transit detection with decent accuracy (≥85% AUC acceptable for MVP) +- Simple vetting diagnostics (odd-even, V-shape, secondary eclipse) +- Web interface where users input TIC ID → get results +- User accounts with usage limits (25 targets/month) +- Payment processing ($9/month subscription) + +### What Hobbyist MVP is NOT: +- FPP/NFPP calculation (Professional tier) +- MCMC posterior distributions (Professional tier) +- Gaia DR3 integration (Education+ tier) +- Peer review system (Professional tier) +- ExoFOP submission (Professional tier) +- DOI assignment (Professional tier) +- Multi-user/organization accounts (Education tier) +- API access (Professional tier) + +--- + +## PHASE 1: MVP TECHNICAL REQUIREMENTS + +### 1. DETECTION ENGINE (CRITICAL) + +#### 1.1 Transit Detection Model +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Requirements: +- Accept TIC ID or coordinates as input +- Retrieve TESS light curve from MAST +- Run transit detection algorithm +- Return: detected (yes/no), confidence score, period estimate + +Minimum Accuracy Target: 85% AUC (upgrade to 95% in Phase 2) + +Implementation Options (choose one): +□ Option A: TinyML model (if already built) +□ Option B: BLS + threshold-based detection +□ Option C: Simplified CNN on phase-folded light curves + +Output Format: +{ + "tic_id": "string", + "detection": true/false, + "confidence": 0.0-1.0, + "period_days": float, + "depth_ppm": float, + "duration_hours": float, + "epoch_btjd": float, + "snr": float +} +``` + +#### 1.2 BLS Periodogram +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Requirements: +- Period search range: 0.5 - 30 days (MVP scope) +- Return top 3 period candidates with power values +- Processing time: < 60 seconds per target + +Libraries to Use: +- astropy.timeseries.BoxLeastSquares +- OR transitleastsquares (TLS) if already integrated + +Output Format: +{ + "periods": [float, float, float], + "powers": [float, float, float], + "best_period": float, + "best_power": float +} +``` + +#### 1.3 Phase Folding +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Requirements: +- Fold light curve at detected period +- Bin data for visualization (50-100 bins) +- Center transit at phase 0.0 + +Output Format: +{ + "phase": [float array], + "flux": [float array], + "flux_err": [float array], + "binned_phase": [float array], + "binned_flux": [float array] +} +``` + +--- + +### 2. VETTING SUITE (CRITICAL) + +#### 2.1 Odd-Even Transit Test +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Purpose: Detect eclipsing binaries with different primary/secondary depths + +Implementation: +1. Separate transits into odd (1,3,5...) and even (2,4,6...) groups +2. Calculate mean depth for each group +3. Compute significance of difference: |depth_odd - depth_even| / sqrt(err_odd² + err_even²) +4. Flag if significance > 3σ + +Output Format: +{ + "odd_depth_ppm": float, + "even_depth_ppm": float, + "depth_difference_sigma": float, + "flag": "PASS" / "WARNING" / "FAIL", + "interpretation": "string" +} + +Pass Criteria: depth_difference_sigma < 3.0 +``` + +#### 2.2 V-Shape Detection +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Purpose: Distinguish planetary transits (flat bottom) from grazing binaries (V-shape) + +Implementation: +1. Fit trapezoid model to phase-folded transit +2. Calculate V-shape parameter: V = 1 - (flat_duration / total_duration) +3. V near 0 = flat bottom (planet), V near 1 = V-shape (binary) + +Output Format: +{ + "v_shape_parameter": float, // 0.0 to 1.0 + "flag": "PASS" / "WARNING" / "FAIL", + "interpretation": "string" +} + +Pass Criteria: v_shape_parameter < 0.5 +Warning: 0.5 - 0.7 +Fail: > 0.7 +``` + +#### 2.3 Secondary Eclipse Check +``` +Priority: P1 (Important) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Purpose: Detect eclipsing binaries by finding eclipse at phase 0.5 + +Implementation: +1. Extract flux around phase 0.5 (±0.05) +2. Compare to out-of-eclipse baseline +3. Calculate depth and significance of any dip + +Output Format: +{ + "secondary_depth_ppm": float, + "secondary_significance": float, + "secondary_detected": true/false, + "flag": "PASS" / "WARNING" / "FAIL", + "interpretation": "string" +} + +Pass Criteria: No significant secondary (significance < 3σ) OR secondary consistent with planetary thermal emission (depth < 500 ppm for hot Jupiters) +``` + +#### 2.4 Vetting Summary Generator +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Combine all vetting results into user-friendly summary: + +Output Format: +{ + "overall_disposition": "PLANET_CANDIDATE" / "LIKELY_FALSE_POSITIVE" / "INCONCLUSIVE", + "confidence_score": 0.0-1.0, + "tests_passed": int, + "tests_failed": int, + "tests_warning": int, + "recommendation": "string", + "details": { + "odd_even": {...}, + "v_shape": {...}, + "secondary": {...} + } +} +``` + +--- + +### 3. DATA ACCESS LAYER (CRITICAL) + +#### 3.1 MAST/TESS Integration +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Requirements: +- Query by TIC ID +- Retrieve 2-minute cadence light curves (preferred) +- Fallback to FFI if 2-min not available +- Handle multi-sector data (stitch up to 3 sectors for MVP) +- Cache downloaded data to reduce API calls + +Libraries: +- lightkurve (recommended) +- astroquery.mast + +Key Functions Needed: +□ get_light_curve(tic_id) -> LightCurve object +□ get_available_sectors(tic_id) -> list of sectors +□ stitch_sectors(light_curves) -> combined LightCurve + +Error Handling: +- No data available: Return clear error message +- Partial data: Process what's available with warning +- API timeout: Retry with exponential backoff (3 attempts) +``` + +#### 3.2 TIC Lookup (Basic) +``` +Priority: P1 (Important) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Requirements: +- Validate TIC ID exists +- Retrieve basic stellar parameters (Teff, radius, magnitude) +- Get known planet status (is this already a confirmed planet?) + +Output Format: +{ + "tic_id": "string", + "ra": float, + "dec": float, + "tmag": float, + "teff": float, + "radius_solar": float, + "known_planet_host": true/false, + "toi_designation": "string" or null +} + +Note: Full Gaia integration deferred to Phase 2 +``` + +--- + +### 4. WEB INTERFACE (CRITICAL) + +#### 4.1 Landing Page +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Elements Required: +□ Hero section with value proposition +□ "How it works" 3-step explanation +□ Pricing display ($9/month, $89/year) +□ Sign up / Login buttons +□ Sample result screenshot +□ Footer with terms, privacy, contact + +Tech Stack Recommendation: +- Next.js or React +- Tailwind CSS for styling +- Vercel for hosting +``` + +#### 4.2 User Authentication +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Requirements: +□ Email/password registration +□ Email verification +□ Login / Logout +□ Password reset +□ Session management + +Implementation Options: +□ Option A: NextAuth.js (recommended for Next.js) +□ Option B: Firebase Auth +□ Option C: Supabase Auth +□ Option D: Auth0 + +Security Requirements: +- Passwords hashed with bcrypt (min 10 rounds) +- HTTPS only +- Secure session cookies (httpOnly, secure, sameSite) +``` + +#### 4.3 Analysis Interface +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +User Flow: +1. User enters TIC ID in search box +2. System validates TIC ID exists +3. User clicks "Analyze" +4. Loading state while processing (show progress) +5. Results displayed with visualizations + +Required UI Components: +□ TIC ID input field with validation +□ "Analyze" button +□ Progress indicator (processing can take 30-60 seconds) +□ Results panel with: + □ Detection verdict (Candidate / Not Detected / False Positive) + □ Confidence score visualization + □ Period and depth display + □ Phase-folded light curve plot (interactive) + □ Raw light curve plot + □ Vetting results breakdown + □ "Download Report" button (PDF) +□ Error states for failed analyses + +Visualization Library: +- Plotly.js (recommended for interactivity) +- OR Chart.js +- OR Recharts (if React) +``` + +#### 4.4 User Dashboard +``` +Priority: P1 (Important) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Required Elements: +□ Analysis history (last 20 analyses) +□ Usage counter (X / 25 targets this month) +□ Subscription status +□ Saved favorites (bookmark interesting targets) +□ Account settings + +Analysis History Table Columns: +- Date +- TIC ID +- Result (Candidate/FP/None) +- Confidence +- Actions (View, Delete) +``` + +#### 4.5 Subscription Management +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Requirements: +□ Display current plan +□ Upgrade/downgrade options +□ Payment method management +□ Billing history +□ Cancel subscription + +Stripe Integration: +□ Stripe Checkout for initial subscription +□ Stripe Customer Portal for management +□ Webhook handling for subscription events +``` + +--- + +### 5. PAYMENT SYSTEM (CRITICAL) + +#### 5.1 Stripe Integration +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Products to Create in Stripe: +□ Hobbyist Monthly: $9/month (price_xxxxx) +□ Hobbyist Annual: $89/year (price_xxxxx) + +Webhook Events to Handle: +□ checkout.session.completed -> Activate subscription +□ customer.subscription.updated -> Update plan +□ customer.subscription.deleted -> Deactivate account +□ invoice.payment_failed -> Send warning email + +Implementation Checklist: +□ Create Stripe account (if not exists) +□ Set up products and prices +□ Implement Checkout Session creation +□ Set up webhook endpoint +□ Test with Stripe test mode +□ Go live with production keys +``` + +#### 5.2 Usage Limits Enforcement +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Hobbyist Limit: 25 targets per calendar month + +Implementation: +1. Track analyses in database with timestamp +2. Before each analysis, check count this month +3. If limit reached, show upgrade prompt +4. Reset counter on 1st of each month + +Database Schema: +analyses { + id: uuid + user_id: uuid + tic_id: string + created_at: timestamp + result: jsonb +} + +Query for limit check: +SELECT COUNT(*) FROM analyses +WHERE user_id = ? +AND created_at >= date_trunc('month', now()) +``` + +--- + +### 6. BACKEND API (CRITICAL) + +#### 6.1 API Endpoints +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Required Endpoints: + +POST /api/auth/register +POST /api/auth/login +POST /api/auth/logout +POST /api/auth/reset-password + +GET /api/user/profile +PUT /api/user/profile +GET /api/user/usage + +POST /api/analyze + Input: { tic_id: string } + Output: { analysis_id: string, status: "processing" } + +GET /api/analyze/:id + Output: Full analysis results + +GET /api/analyses + Output: List of user's analyses (paginated) + +DELETE /api/analyses/:id + +POST /api/subscription/create-checkout +POST /api/subscription/webhook (Stripe) +GET /api/subscription/portal +``` + +#### 6.2 Background Job Processing +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Analysis jobs should run async (30-60 second processing time) + +Options: +□ Option A: Serverless function with longer timeout (Vercel Pro, AWS Lambda) +□ Option B: Dedicated worker process (Railway, Render) +□ Option C: Queue system (Redis + Bull, AWS SQS) + +Recommended for MVP: +- Vercel Pro with 60-second function timeout +- OR Railway with background worker + +Job Flow: +1. POST /api/analyze creates job, returns job_id immediately +2. Frontend polls GET /api/analyze/:id every 5 seconds +3. Worker processes job, updates database +4. Poll returns completed results +``` + +--- + +### 7. DATABASE (CRITICAL) + +#### 7.1 Schema Design +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Recommended: PostgreSQL (Supabase, Railway, or Neon) + +Tables: + +users { + id: uuid PRIMARY KEY + email: string UNIQUE + password_hash: string + created_at: timestamp + email_verified: boolean + stripe_customer_id: string +} + +subscriptions { + id: uuid PRIMARY KEY + user_id: uuid REFERENCES users + stripe_subscription_id: string + status: enum ('active', 'canceled', 'past_due') + plan: enum ('hobbyist_monthly', 'hobbyist_annual') + current_period_end: timestamp +} + +analyses { + id: uuid PRIMARY KEY + user_id: uuid REFERENCES users + tic_id: string + status: enum ('pending', 'processing', 'completed', 'failed') + created_at: timestamp + completed_at: timestamp + result: jsonb + error: string +} + +favorites { + id: uuid PRIMARY KEY + user_id: uuid REFERENCES users + tic_id: string + analysis_id: uuid REFERENCES analyses + created_at: timestamp +} + +Indexes: +- analyses(user_id, created_at) for usage counting +- analyses(status) for job processing +- users(email) for login +- users(stripe_customer_id) for webhook handling +``` + +--- + +### 8. INFRASTRUCTURE (CRITICAL) + +#### 8.1 Hosting Setup +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Recommended Stack for MVP: + +Frontend + API: +□ Vercel (Next.js) - Free tier to start, Pro for longer functions + +Database: +□ Supabase (PostgreSQL) - Free tier: 500MB, 2 projects +□ OR Neon (PostgreSQL) - Free tier: 3GB + +Background Processing: +□ Vercel Pro Functions (60s timeout) +□ OR Railway worker ($5/month) + +File Storage (for cached light curves): +□ Vercel Blob +□ OR Supabase Storage +□ OR AWS S3 + +Domain: +□ larun.space (if owned) +□ Configure DNS +□ SSL automatic via Vercel +``` + +#### 8.2 Environment Variables +``` +Priority: P0 (Blocker) +Status: [ ] Not Started / [ ] In Progress / [ ] Complete / [ ] Tested + +Required Environment Variables: + +# Database +DATABASE_URL=postgresql://... + +# Auth +JWT_SECRET=random-32-char-string +NEXTAUTH_SECRET=random-32-char-string +NEXTAUTH_URL=https://larun.space + +# Stripe +STRIPE_SECRET_KEY=sk_live_... +STRIPE_WEBHOOK_SECRET=whsec_... +NEXT_PUBLIC_STRIPE_PUBLISHABLE_KEY=pk_live_... + +# Email (for verification, password reset) +SMTP_HOST=smtp.sendgrid.net +SMTP_USER=apikey +SMTP_PASS=SG.xxxxx + +# Optional: Error tracking +SENTRY_DSN=https://... +``` + +--- + +## PHASE 1 IMPLEMENTATION CHECKLIST + +### Week 1-2: Core Detection Pipeline +``` +□ Set up project repository +□ Configure development environment +□ Implement MAST data access +□ Implement BLS periodogram +□ Implement phase folding +□ Implement transit detection (model or threshold-based) +□ Write unit tests for detection pipeline +□ Test on 10 known planets, 10 known false positives +``` + +### Week 3-4: Vetting & API +``` +□ Implement odd-even test +□ Implement V-shape detection +□ Implement secondary eclipse check +□ Create vetting summary generator +□ Set up database (Supabase/Neon) +□ Implement API endpoints +□ Set up background job processing +□ Test full pipeline end-to-end +``` + +### Week 5-6: Frontend & Auth +``` +□ Create landing page +□ Implement user authentication +□ Build analysis interface +□ Build results display with visualizations +□ Build user dashboard +□ Implement usage tracking +□ Mobile responsive testing +``` + +### Week 7-8: Payments & Launch +``` +□ Set up Stripe products +□ Implement checkout flow +□ Implement webhook handling +□ Set up subscription management +□ Production deployment +□ Domain configuration +□ Final testing (10 test users) +□ Soft launch to early adopters +□ Monitor and fix critical bugs +``` + +--- + +## MVP SUCCESS CRITERIA + +### Launch Readiness Checklist +``` +□ User can register and verify email +□ User can subscribe via Stripe ($9/month or $89/year) +□ User can input TIC ID and receive analysis within 2 minutes +□ Analysis includes detection result + 3 vetting tests +□ User can view analysis history +□ Usage limit (25/month) is enforced +□ User can cancel subscription +□ System handles errors gracefully with user-friendly messages +□ Site loads in < 3 seconds +□ Works on mobile browsers +``` + +### Quality Thresholds +``` +□ Detection accuracy: ≥85% on test set of 50 known planets +□ False positive rate: <20% (can improve post-launch) +□ API uptime: >99% (use Vercel/Railway reliability) +□ Page load time: <3 seconds +□ Analysis completion: <2 minutes for 95% of targets +``` + +### Post-Launch Week 1 Targets +``` +□ 10+ registered users +□ 3+ paying subscribers +□ <5 critical bugs reported +□ Zero security incidents +□ Collect feedback from 5 users +``` + +--- + +## WHAT'S EXPLICITLY OUT OF SCOPE FOR MVP + +Do NOT build these features for initial launch: + +``` +❌ FPP/NFPP Bayesian calculation (Phase 2) +❌ Gaia DR3 integration (Phase 2) +❌ MCMC posterior distributions (Phase 2) +❌ Multi-sector stitching beyond 3 sectors (Phase 2) +❌ TLS algorithm (BLS is sufficient for MVP) +❌ Peer review system (Phase 3) +❌ ExoFOP submission (Phase 3) +❌ DOI assignment (Phase 3) +❌ API access for users (Phase 3) +❌ Education tier features (Phase 2) +❌ Professional tier features (Phase 3) +❌ Mobile app (Web responsive is sufficient) +❌ Advanced stellar characterization +❌ Centroid analysis +❌ Real-time TESS data monitoring +❌ Batch processing +❌ Custom aperture photometry +``` + +--- + +## RISK MITIGATION + +### Technical Risks +``` +Risk: Detection accuracy too low +Mitigation: Start with conservative thresholds, display confidence prominently, iterate based on user feedback + +Risk: MAST API rate limiting +Mitigation: Implement caching, queue requests, show estimated wait times + +Risk: Processing takes too long +Mitigation: Show progress indicator, process in background, email when complete + +Risk: Stripe integration issues +Mitigation: Test thoroughly in test mode, start with simple checkout flow +``` + +### Business Risks +``` +Risk: No users sign up +Mitigation: Soft launch to astronomy communities (Reddit r/exoplanets, Twitter astronomy), offer free trial week + +Risk: Users churn after first month +Mitigation: Collect feedback aggressively, iterate fast, add value quickly + +Risk: Competitors copy features +Mitigation: Move fast, build community, iterate toward professional features +``` + +--- + +## SUPPORT & DOCUMENTATION + +### Minimum Documentation for Launch +``` +□ FAQ page (10 common questions) +□ "How to use" tutorial (1 page with screenshots) +□ Terms of Service +□ Privacy Policy +□ Contact email configured +``` + +### Support Channels +``` +□ Email: support@larun.space +□ Response time target: <24 hours +□ Consider: Discord community (free, builds engagement) +``` + +--- + +## METRICS TO TRACK FROM DAY 1 + +``` +□ Total registered users +□ Conversion rate (registered → paid) +□ Monthly Active Users (MAU) +□ Analyses per user per month +□ Churn rate (monthly) +□ Revenue (MRR) +□ Error rate (failed analyses / total) +□ Average processing time +□ User feedback (NPS or simple rating) +``` + +Use: Vercel Analytics (free) + Stripe Dashboard + Simple database queries + +--- + +## PHASE 2 PREVIEW (After MVP Success) + +Once MVP is stable with 50+ paying users: + +``` +Phase 2A: Accuracy Improvements (Month 3) +- Upgrade detection model to 95% AUC +- Add TLS algorithm option +- Improve vetting accuracy + +Phase 2B: Education Tier (Month 4) +- Simplified FPP calculation +- Basic Gaia integration +- Multi-user accounts +- Admin dashboard +- Curriculum materials + +Phase 2C: Professional Foundation (Month 5-6) +- Full Bayesian FPP +- MCMC posteriors +- Enhanced Gaia integration +- Peer review system (basic) +``` + +--- + +## QUICK START COMMANDS + +```bash +# Clone and setup (example for Next.js) +npx create-next-app@latest larun-space --typescript --tailwind --app +cd larun-space + +# Install key dependencies +npm install @stripe/stripe-js stripe +npm install next-auth +npm install @supabase/supabase-js +npm install plotly.js-dist-min react-plotly.js +npm install lightkurve # If using Python backend + +# Database setup (Supabase CLI) +npx supabase init +npx supabase db push + +# Run development +npm run dev +``` + +--- + +## EXISTING LARUN COMPONENTS TO REUSE + +The following components from the current LARUN codebase can be leveraged for MVP: + +### Already Implemented (Ready to Use) +| Component | Location | Status | +|-----------|----------|--------| +| BLS Periodogram | `src/skills/periodogram.py` | ✅ Ready | +| Phase Folding | `src/skills/periodogram.py` | ✅ Ready | +| Odd-Even Test | `src/skills/vetting.py` | ✅ Ready | +| V-Shape Detection | `src/skills/vetting.py` | ✅ Ready | +| Secondary Eclipse | `src/skills/vetting.py` | ✅ Ready | +| MAST Data Access | `src/pipeline/nasa_pipeline.py` | ✅ Ready | +| Transit Detection | `src/model/spectral_cnn.py` | ⚠️ 81.8% AUC | +| FastAPI Backend | `api.py` | ✅ Ready | + +### Needs Adaptation for Web +| Component | Current | Needed for MVP | +|-----------|---------|----------------| +| CLI Interface | `larun.py` | → Web API endpoints | +| Report Generator | `src/reporter/` | → PDF download | +| Figure Generator | `src/skills/figures.py` | → Plotly.js | + +--- + +## CONTACT & ESCALATION + +For MVP development questions: +- Technical blockers: Document and escalate immediately +- Scope creep: Refer to "OUT OF SCOPE" section +- Timeline risk: Cut features, not quality + +--- + +*This document is the single source of truth for MVP scope. Any feature not listed here requires explicit approval before implementation.* + +**START DATE:** _______________ +**TARGET LAUNCH:** _______________ +**OWNER:** Padmanaban + +--- + +## DAILY STANDUP TEMPLATE + +``` +Yesterday: +- [ ] What I completed + +Today: +- [ ] What I'm working on + +Blockers: +- [ ] Any issues preventing progress + +MVP Checklist Progress: X / 47 items complete +``` + +--- + +*Document Version: 1.0* +*Last Updated: February 2, 2026*