Skip to content

Tour step 16 describes the servitor Wrap-up prompt with a stale checklist, line anchor, and snapshot count #1225

Description

@Ljferrer

Flagged by phase-5 seats (task 5.1, landed bd5faa9); partly pre-existing.

.tours/architect-war-system.tour step 16 narrates the servitor Wrap-up dispatched prompt as a "four-point checklist" including a D4 index-hygiene point that no longer exists (the prompt carries D1/D2/D3). Task 5.1 rewrote that prompt into a skeleton-plus-card-pointer shape, so the step also now carries a stale line anchor and a stale snapshot count of the literal.

Pre-existing on the D4 point; newly stale on the anchor and count. No remaining phase of plan 2026-07-28-prompt-surface-simplification touches .tours/, so this has no in-plan home.

Same class as the phase-3 finding absorbed by 39afb54 (tour step 9’s stale "≈729" line-number fact) and the recorded lesson tour-narrative-can-assert-a-false-code-fact-that-survives-until-a-doc-sweep-catches-it — anchor by named construct, never line number.

Metadata

Metadata

Assignees

No one assigned

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions