Skip to content

Capturing the impact of PTO control for WEC simulation #34

Description

@Ribzmann

Hello,
Thank you for developping this tool, it seems very usefull and complete.
I have a problem though. I want to use DTOcean to optimize the array configuration of wave energy converters. I already know the annual power output for one device through using WEC-sim and damping control.
But when I use the WEC simulator and then run the strategy I have a completely different output (same nemoh config and same wave time series).
Nemoh results are coherent with the "desktop" version but the problem seems to come from the performance fit. I don't really understand how it works. How are the different power matrix computed ? And which one is used at the end for computations of the annual production? The fitted one if fitting is done, okay, but it seems to use the original one if the fitting was skipped. Isn't there a way to use my user provided matrix (the one from WEC-sim) to compute the annual production ?
Thank you very much and keep up the good work, it is a very good tool and make the work of many easier.
Best regards
Antoine

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions