Skip to content

Latest commit

 

History

History
133 lines (104 loc) · 4.05 KB

File metadata and controls

133 lines (104 loc) · 4.05 KB

JackerBox MVP Checklist

Use this checklist to verify that all MVP features are working properly before considering the MVP 100% complete.

User Authentication (100% Complete) ✅

  • Email/password registration
  • Login functionality
  • Google OAuth login
  • Password reset flow
  • User profile management
  • Role switching (renter/owner/both)

Equipment Management (100% Complete) ✅

  • Creating equipment listings
  • Uploading images (minimum 5 required)
  • Local fallbacks for images
  • Editing equipment details
  • Removing equipment listings
  • Equipment availability calendar

Rental Process (100% Complete) ✅

  • Date selection calendar
  • Rental request submission
  • Owner approval workflow
  • Mock payment processing
  • Rental completion by both parties
  • Security deposit handling

Reviews & Ratings (100% Complete) ✅

  • Review form UI
  • Star rating component
  • Review submission API
  • Review display on equipment page
  • Owner responses to reviews
  • Average rating calculation

Messaging System (100% Complete) ✅

  • Basic messaging interface
  • Message thread management
  • Real-time updates (or fallback polling)
  • Message notifications
  • Attachment support

Notifications (100% Complete) ✅

  • Notification system framework
  • Notification dropdown UI
  • Push notifications setup
  • Email notifications integration
  • Notification preferences

Search & Discovery (100% Complete) ✅

  • Browse all equipment
  • Category filtering
  • Location-based filtering
  • Price range filtering
  • Availability filtering

Trust & Safety (100% Complete) ✅

  • ID verification flow
  • Phone verification flow
  • User reporting system
  • Content moderation tools
  • Terms of service/privacy policy

Admin Features (100% Complete) ✅

  • Admin dashboard
  • Equipment moderation
  • User management
  • Rental dispute handling
  • System analytics

Mobile Experience (100% Complete) ✅

  • Responsive design
  • Mobile navigation
  • Touch-friendly UI elements
  • Installable PWA
  • Mobile optimized images

Testing Status

Complete User Journey 1: Equipment Owner

  • Create a new user account (Implemented, needs testing)
  • Complete profile setup (Implemented, needs testing)
  • Create an equipment listing with images (Implemented, needs testing)
  • Receive a rental request (Implemented, needs testing)
  • Approve the rental request (Implemented, needs testing)
  • Message the renter (Implemented, needs testing)
  • Mark the rental as complete (Implemented, needs testing)
  • Respond to a review (Implemented, needs testing)

Complete User Journey 2: Equipment Renter

  • Browse available equipment (Implemented, needs testing)
  • Filter by category and price (Implemented, needs testing)
  • View equipment details (Implemented, needs testing)
  • Send a rental request (Implemented, needs testing)
  • Complete the mock payment (Implemented, needs testing)
  • Message the owner (Implemented, needs testing)
  • Mark the rental as complete (Implemented, needs testing)
  • Leave a review (Implemented, needs testing)

Complete User Journey 3: Admin

  • Log in as admin (Implemented, needs testing)
  • Review pending equipment listings (Implemented, needs testing)
  • Moderate user accounts (Implemented, needs testing)
  • Handle a simulated dispute (Implemented, needs testing)
  • Generate system reports (Implemented, needs testing)

Overall Progress: 100% Complete 🚀

The application is ready for end-to-end testing using the guide in TEST-USER-JOURNEY.md. After testing, we can consider the MVP complete!

Deployment Checklist

  • Environment variables configured
  • Database migrations prepared
  • Production database created and connected
  • Production build tested
  • Analytics integration
  • Error monitoring setup
  • SSL/HTTPS enabled
  • Performance optimization
  • Backup strategy
  • CI/CD pipeline configured