Getting Started

This is the shortest path to using DAD-M on a new project.

If an AI system is loading runtime context, start with runtime/AI_BIOS.md and follow the registry/profile flow instead of loading multiple onboarding documents.

1. Create the project brief

Capture the minimum context before any design work starts:

  • project name
  • goal in one sentence
  • measurable end state
  • technologies or environment
  • timeframe if relevant
  • non-goals
  • specific ideas

2. Set safety boundaries

Decide what the AI-assisted workflow may and may not touch:

  • allowed areas
  • forbidden areas
  • whether dependency changes are allowed
  • whether network access is allowed
  • which proofs are required

3. Declare scope

List the specific files, folders, systems, or domains this project is allowed to touch. Anything not listed is off limits by default. This is the scope declaration — write it before the milestone plan, because the milestone plan references it.

4. Build the milestone plan

DAD-M uses a milestone model rather than one large task. A typical project has 10 to 20 milestones, each with:

  • goal
  • scope
  • deliverables
  • acceptance criteria
  • risks (each with a severity label: info / low / medium / high / critical)
  • dependencies (which milestones must complete before this one starts; write none if there are none)
  • priority (P1 = required to function; P2 = important but not blocking; P3 = deferrable)

5. Obtain plan approval

After the milestone plan is written, record an approval artifact before starting M1:

artifact: milestone-plan-approval
plan-version: <version>
status: approved | rejected | deferred
date: <YYYY-MM-DD>
decided-by: <name or role>

This artifact is immutable. Work on M1 must not begin without an approved plan. See governance/policies/approval-policy.yaml for the operative rules.

6. Run the first cycle

For milestone M1, work through the four phases in order:

  1. Discover: inventory the current state and identify risks.
  2. Apply: design the solution within the discovered facts.
  3. Deploy: implement the approved design and record proofs.
  4. Monitor: validate the result and capture follow-up actions.

7. Repeat per milestone

The Monitor output is not the end of the method. It becomes the starting point for the next Discover step.

Practical starting point

Use runtime/cards/bootstrap-card.md for the shortest runtime setup path, framework/core/bootstrap.md for the full setup template, and framework/core/deliverables.md as the reporting format.

For a public technical milestone example, review docs/examples/rbac-case-example.md.